My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018 024 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2018 Ordinances
>
2018 024 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 10:59:31 AM
Creation date
3/22/2019 4:26:52 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
024
Date
8/20/2018
Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORDINANCE N0. 2018-24 <br />PAG E 7 <br />(C) <br />(D) <br />(E) <br />(F) <br />(G) <br />(H). <br />(I) <br />(J) <br />(K) <br />the application or initial registration and available at all <br />reasonable times to be notified in case of emergency. <br />A description of the.existing or proposed Small Cell Facility <br />and Wireless Support Structure iri the Village's Public Right- <br />of-Way, including but not limited to engineering plans, <br />specifications or a map, all in sufficient detail to identify: <br />(i) the location of the applicant's Small Cell Facility and <br />Wireless Support Structure or proposed Small Cell <br />Facility and Wireless Support Structure: . <br />(ii) the location of all. existing Overhead. and/or <br />underground Facilities, Facility, Small Cell <br />Facilities, Wireless Support Structures in the Public <br />Right-of-Way in the area of the applicant's or Service <br />Provider's Small. Cell Facility and Wireless Support <br />Structure or proposed Small Cell Facility and Wireless . <br />Support Structure that is sufficient to show the impact <br />of the applicant's Small Cell Facility and Wireless <br />Support Structure on other existing Facilities, Facility, <br />Small Cell Facility or Wireless Support Structures. <br />(iii) the location of all overhead and underground utility <br />easements. <br />A preliminary Construction schedule and completion date for <br />all planned Capital Improvements: <br />Evidence that the applicant or Service Provider has <br />complied, or_will coriiply, with indemnification and insurance <br />requirements of this Chapter. <br />Information. sufficient to. determine that the applicant or <br />Service Provider has received any certificate of authority <br />required by the PUCO. <br />A description of the construction. methods to be employed for . <br />the protection of existing structures, fixtures and Facilities in <br />or adjacent to the. Public Right-of-Way. <br />A description of the structures, improvements and <br />obstructions, if any, that the applicant proposes to <br />temporarily or permanently remove or relocate. - <br />A description of the impact of Construction, Reconstruction, <br />installation, maintenance or repair of a Small Cell Facility <br />and Wireless Support Structure on trees in or adjacent to the <br />Public Right-of-Way, together with a landscape plan for <br />protecting, trimming, removing; replacing and restoring any <br />trees or areas disturbed during Construction. All applications shall be accompanied by the certification of a <br />State of Ohio registered professional engineer that tfie <br />drawings, plans and specifications submitted with the <br />application comply with applicable technical codes, rules and <br />regulations. <br />All.applications which involve a Lane Obstruction or wo.rk on,
The URL can be used to link to this page
Your browser does not support the video tag.