MAYFIELD VILLAGE, OHIO
<br />CONCRETE PAVEMENT AND INLET REPAIR IMPROVMENT
<br />Bid Tabulation (July 13,2018)
<br /> ORS ENTERPRISES, INC. TC CONSTRUCTION CO. ING FABRIZI TRUCKING 8 PAVING CO., IMG. C.A. AGRE3TA GONSTRIICTION CO,
<br /> 6339 CANAL ROAO 2936 LYMN DR. 20389 FIRST AVENUE 4788 GREENVALE ROAO
<br />BIDDERS GARFIELO HTS., oH 44726 WILLOUGH9Y HILLS, OH 44092 MIOOLEBURG NTS., OH 41130 SOUTH EUCLIU, OH 44721
<br />
<br />II
<br />LABORC09T MATERIAL
<br />?NITPRICE
<br />TOTAL
<br />LABORCOST MATERIAL
<br />?NITPRICE
<br />TOTAL
<br />LABORCOST MATERIAL
<br />?XITPRICE
<br />TOTAL
<br />IABORC05T MATEftIAL
<br />UNITPRICE
<br />TOTAL
<br />p OESCRIPTION ONTV. NIT COST COST COST COST
<br /> ITEM 255: FULL OEPTH PAVEMENT REMOVAL AND RIGIO
<br />1 REPIACEMENT CLASSOCMS ASPERPLAN 400 SY $5625 $55.00 $111.25 $44500.00 $6000 $60.00 $120.00 $4800000 $115.00 $68.00 $183.00 $73200.00 $140.00 $60.00 $200000 $80000.00
<br />Z ITEM 451: 6" REINFORCEO CONCRETE PAVEMENT, CL4SS QC
<br />0
<br />3
<br /> MS AS PER PLAN DRIVE APRON 20 SY $35.00 535400 $70.00 $1,400400 $45.00 $40,00 $85,00 $1 700.00 $50.00 $42.50 $92.50 $1 850.00 ,00
<br />$5 $
<br />0400 $B0.00 $1fi00.00
<br />3 ITEM 609 COMBINATION CURB AND GUTTER TYPE 3 32 FT 517.5D 517.50 $3500 $1,120.00 $40.00 $24.00 364.00 $2,048.00 $40.00 526.00 $66.00 $2 772.00 $20.0o 815.00 $35.00 $1,120. 00
<br />4 ITEM617: PAVEMENTINLETN0.1-2ARECONSTRUCTEDTO
<br />40000
<br />2
<br />938
<br />00
<br />$6338
<br />00
<br />831690
<br />00
<br />$4500
<br />00
<br />$3000
<br />00
<br />$7
<br />500
<br />00
<br />$37500
<br />00
<br />5 GRADE SPERPLAN
<br />ITEM 614: MAMTENANCE Of TRAFFIC AS PER PLAN 5
<br />LUMP EACH
<br />LUMP 52000.00
<br />$6,000.00 85,500.00
<br />$0000 87500,00
<br />$6,000.00 $37,500.00
<br />56,000.00 82400.00
<br />515,000.00 54,000.0D
<br />$0.00 $6400.00
<br />$15,000.00 $32000.00
<br />b15,00000 $3
<br />510,08000 $
<br />,
<br />.
<br />$3,500.00 .
<br />$13,580.00 .
<br />573,580.00 .
<br />$8000.00 ,
<br />$0.00 .
<br />.
<br />$e,ooo.aa .
<br />$8000.00
<br />8 ITEM624'. MOBILRATION LUMP LUMP $4,800.00 $000 $4,900.00 $4,800.00 $2.500.00 $0.00 82,504.00 $2.500,00 $4000A0 $7,200.00 $5,200D0 $5,200.00 $2,000.00 $0.00 $2,000.00 $2,000.00
<br />7 ITEM632: DETECTORLOOP 7 EACH $800.00 $240000 $3200.00 83200.00 51.400400 51,000.00 $2,400.00 52,400.00 $1200.00 $1,000.00 $2200.00 $2200.00 $1000.00 5500.00 51500.00 $1500.00
<br /> ITEM PRECONSTRUCTION VIDEO
<br />8 SPECIAL. LUMP LUMP $3400.00 5100600 $3,500.00 $3500.00 31,000.00 $0.00 51000.00 $1,000.00 $1500.00 $560.00 $2060.00 $2,060.00 $250.00 550.00 $30000 5300.00
<br /> ITEM OISCRETIONARYALLOWANCETOBEUTILIZEDAS
<br />9 SPECIAL: DIRECTED BY THE ENGMEER FOR UNSCHEDULED
<br /> WORK ITEMS NOT INCLUDED IN THIS PROPOSAL OR
<br />
<br />T"F
<br />
<br />LUMP
<br />WMP
<br />$75000.00
<br />$15000.00
<br />815000.00
<br />415000.00
<br />$75,000.00
<br />$15,00 00
<br />E15000.00
<br />$75000400
<br />
<br />
<br />ie.i?s uIu.i. BT-1
|