Laserfiche WebLink
MAYFIELD VILLAGE, OHIO <br />CONCRETE PAVEMENT AND INLET REPAIR IMPROVMENT <br />Bid Tabulation (July 13,2018) <br /> ORS ENTERPRISES, INC. TC CONSTRUCTION CO. ING FABRIZI TRUCKING 8 PAVING CO., IMG. C.A. AGRE3TA GONSTRIICTION CO, <br /> 6339 CANAL ROAO 2936 LYMN DR. 20389 FIRST AVENUE 4788 GREENVALE ROAO <br />BIDDERS GARFIELO HTS., oH 44726 WILLOUGH9Y HILLS, OH 44092 MIOOLEBURG NTS., OH 41130 SOUTH EUCLIU, OH 44721 <br /> <br />II <br />LABORC09T MATERIAL <br />?NITPRICE <br />TOTAL <br />LABORCOST MATERIAL <br />?NITPRICE <br />TOTAL <br />LABORCOST MATERIAL <br />?XITPRICE <br />TOTAL <br />IABORC05T MATEftIAL <br />UNITPRICE <br />TOTAL <br />p OESCRIPTION ONTV. NIT COST COST COST COST <br /> ITEM 255: FULL OEPTH PAVEMENT REMOVAL AND RIGIO <br />1 REPIACEMENT CLASSOCMS ASPERPLAN 400 SY $5625 $55.00 $111.25 $44500.00 $6000 $60.00 $120.00 $4800000 $115.00 $68.00 $183.00 $73200.00 $140.00 $60.00 $200000 $80000.00 <br />Z ITEM 451: 6" REINFORCEO CONCRETE PAVEMENT, CL4SS QC <br />0 <br />3 <br /> MS AS PER PLAN DRIVE APRON 20 SY $35.00 535400 $70.00 $1,400400 $45.00 $40,00 $85,00 $1 700.00 $50.00 $42.50 $92.50 $1 850.00 ,00 <br />$5 $ <br />0400 $B0.00 $1fi00.00 <br />3 ITEM 609 COMBINATION CURB AND GUTTER TYPE 3 32 FT 517.5D 517.50 $3500 $1,120.00 $40.00 $24.00 364.00 $2,048.00 $40.00 526.00 $66.00 $2 772.00 $20.0o 815.00 $35.00 $1,120. 00 <br />4 ITEM617: PAVEMENTINLETN0.1-2ARECONSTRUCTEDTO <br />40000 <br />2 <br />938 <br />00 <br />$6338 <br />00 <br />831690 <br />00 <br />$4500 <br />00 <br />$3000 <br />00 <br />$7 <br />500 <br />00 <br />$37500 <br />00 <br />5 GRADE SPERPLAN <br />ITEM 614: MAMTENANCE Of TRAFFIC AS PER PLAN 5 <br />LUMP EACH <br />LUMP 52000.00 <br />$6,000.00 85,500.00 <br />$0000 87500,00 <br />$6,000.00 $37,500.00 <br />56,000.00 82400.00 <br />515,000.00 54,000.0D <br />$0.00 $6400.00 <br />$15,000.00 $32000.00 <br />b15,00000 $3 <br />510,08000 $ <br />, <br />. <br />$3,500.00 . <br />$13,580.00 . <br />573,580.00 . <br />$8000.00 , <br />$0.00 . <br />. <br />$e,ooo.aa . <br />$8000.00 <br />8 ITEM624'. MOBILRATION LUMP LUMP $4,800.00 $000 $4,900.00 $4,800.00 $2.500.00 $0.00 82,504.00 $2.500,00 $4000A0 $7,200.00 $5,200D0 $5,200.00 $2,000.00 $0.00 $2,000.00 $2,000.00 <br />7 ITEM632: DETECTORLOOP 7 EACH $800.00 $240000 $3200.00 83200.00 51.400400 51,000.00 $2,400.00 52,400.00 $1200.00 $1,000.00 $2200.00 $2200.00 $1000.00 5500.00 51500.00 $1500.00 <br /> ITEM PRECONSTRUCTION VIDEO <br />8 SPECIAL. LUMP LUMP $3400.00 5100600 $3,500.00 $3500.00 31,000.00 $0.00 51000.00 $1,000.00 $1500.00 $560.00 $2060.00 $2,060.00 $250.00 550.00 $30000 5300.00 <br /> ITEM OISCRETIONARYALLOWANCETOBEUTILIZEDAS <br />9 SPECIAL: DIRECTED BY THE ENGMEER FOR UNSCHEDULED <br /> WORK ITEMS NOT INCLUDED IN THIS PROPOSAL OR <br /> <br />T"F <br /> <br />LUMP <br />WMP <br />$75000.00 <br />$15000.00 <br />815000.00 <br />415000.00 <br />$75,000.00 <br />$15,00 00 <br />E15000.00 <br />$75000400 <br /> <br /> <br />ie.i?s uIu.i. BT-1