Laserfiche WebLink
MAYFIELD VILLAGE <br />Traffic Signal Improvements for SOM Center Road and Hickory Hill Drive <br />Bid Tabulation (December 14, 2018) <br />C.A. AGRESTA CONSTRUCTION CO. <br />4186 GREENVALE ROAD <br />SOU7H EUCLID, OH 46127 <br />P: (216) 382-7525 F: (278) 382-7878 S.E.T., INC. <br />235 E. WATER STREET <br />LOWELLVILLE, OH 44436 <br />7: (330) 638-8724, EXT. 102 F: (330) 5389274 <br />LABORCOST MATERIAL <br />COST UNITPRICE TOTAL LABORCOST MATERIAL <br />COST UNITPRICE TOTAL <br />$3000.00 $12,000.00 $15000.00 $75000.00 $5.000000 $18,000.00 $23000.00 $23000.00 <br />$500.00 31600.00 $2100.00 $2100.00 $2000.00 $600.00 S2600.00 $2600.00 <br />$800.00 $1 000.00 31,800.00 $1 800.00 $300.00 $550900 $850 00 3850.00 <br />$250.00 5800000 $850.00 53.400.00 5400.00 5600.00 $7 000.00 $4 000.00 <br />$1.00 $0.50 $1.50 $1053.00 32.00 $1.00 $3400 $2108.00 <br />$500.00 <br />$200.00 $3000.00 <br />$250.00 $3500.00 <br />$450.00 $3,500.00 <br />$1800.00 41000.00 <br />$250.00 $41000.00 <br />$250.00 $5000.00 <br />$500.00 $5000.00 <br />$2000.00 <br />$23 000.00 $0.00 $23 000.00 $23 000.00 $5 000.00 $1 000.00 $6 000.00 $6 000.00 <br />$3,000.00 $0.00 $3 000.00 $3,000.00 $2 000.00 S500.00 12,100,01 52 500.00 <br />$8 000.00 50400 $6 000.00 $6 000.00 $20 000.00 $20 000.00 <br /> $30 000.00 $30000.00 ;;;; E; $30 000.00 830 000.00 <br /> <br /> <br />ivu u n-i?. mu_ri. BT-4 12111mie: r_a; rai