My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020 005 RESOLUTION
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2020 Resolutions
>
2020 005 RESOLUTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 12:37:58 PM
Creation date
3/1/2023 1:24:19 PM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
2020 005
Date
1/21/2020
Year
2020
Title
CSWD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. Initial SWP3 reviews, as received (> 1 acre): <br />c. Subsequent SWP3 review, as needed (> 1 acre); <br />d. Technical advisory inspections (field reviews) and reporting (12 per year per site) once <br />construction begins, <br />e. Plan reviews for abbreviated construction plans will be performed by request of the City. <br />3. Construction site activities $11,000.00 <br />NPDES, Minimum Control Measure 5 — Post Construction Stormwater Management <br />As required under the MS4 Permit, the Cuyahoga SWCD will also provide annual inspections of all post <br />construction stormwater control measures (water quality and water quantity basins): <br />a. Transition meetings will be held with SWCD staff, city personnel and site personnel to review long- <br />term operations and maintenance needs, and reporting requirements, <br />b. 12-18 annual long-term maintenance field reviews, including rapid field assessment, of post - <br />construction stormwater quality facilities; <br />c. Technical advisory inspection and reporting to the City and landowners with SCMs on their <br />properties; <br />d. Project file management <br />e. Mapping of facility locations; <br />f. Maintenance program fact sheets, individual site assessments and training, when needed. <br />2. Post -Construction Program -$2,000.00 <br />The Cuyahoga SWCD will also provide technical advice on planning issues, including: <br />a. Technical assistance on local legislation if the City pursues universal application of accepted best <br />management practices at construction sites; <br />b. Sound storm water management; <br />c. Protection of sensitive natural areas; <br />d. General evaluation of sensitive areas such as creeks, floodplains, soils, slopes, <br />wetlands, watersheds, woodlands or other unique areas that are planned for development; <br />e. Recommendations for stream bank and wetlands restoration, slope erosion control; and <br />f. Small drainage systems and wildlife habitat enhancements. <br />Village's Role Related to Storm Water Pollution Prevention Activities <br />I. The Village will designate someone to serve as the Village's liaison for the storm water pollution prevention <br />program. <br />2. The Village will recognize the environmental and economic functions of naturally -vegetated open spaces, <br />such as wetlands, stream corridors, ravines, woodlands and fields as worthy of the Village's protection as <br />open space. <br />3. The Village will utilize the Cuyahoga SWCD's technical assistance including plan reviews, project <br />inventories, evaluations, and inspections of planned construction sites, water quality and water quantity <br />basins or sensitive natural areas of concern. <br />4. The Village will direct builders, developers and consultants to the Cuyahoga SWCD for assistance on <br />planning and conservation early in the concept planning stage of the construction planning cycle. <br />2 1 Cuyahoga SWCD MOU 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.