My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021 38 RESOLUTION
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2021 Resolutions
>
2021 38 RESOLUTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2023 1:24:15 PM
Creation date
3/3/2023 11:50:01 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
2021 38
Date
10/18/2021
Year
2021
Title
RYCON CIVIC CENTER RENOVATIONS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2021-38 <br />INTRODUCED BY: Mayor Bodnar <br />AN EMERGENCY RESOLUTION <br />AUTHORIZING MAYFIELD VILLAGE TO ACCEPT THE BID OF RYCON <br />CONSTRUCTION INC. FOR THE CIVIC CENTER RESTROOM & KITCHEN <br />RENOVATIONS PROJECT IN THE AMOUNT OF $308,500.00 PLUS A TEN PERCENT <br />CONTINGENCY FOR A TOTAL AMOUNT NOT TO EXCEED $339,350.00 <br />WHEREAS, it has been deemed in the best interest of the health, safety and welfare of all <br />Village residents and inhabitants to renovate the main restrooms and kitchen in the Mayfield <br />Village Civic Center to make them ADA compliant; and <br />WHEREAS, the renovation project was estimated at $370,000.00 and was advertised for <br />bid for three consecutive weeks as required by ORC Section 735.05; and <br />WHEREAS, a bid alternative was included in the advertisement to install new flooring in <br />the Civic Center lobby to allow for smooth floor transitions into the renovated restrooms and <br />kitchens; and <br />WHEREAS, the bids were received, opened and tabulated as per published notice on <br />October 1, 2021; and <br />WHEREAS, the base bid of Rycon Construction Inc. in the amount of Two Hundred <br />Ninety -Six Thousand Five Hundred Dollars ($296,500.00) was the lowest and best bid received <br />and the alternate bid of Rycon Construction Inc. in the amount of Twelve Thousand Dollars <br />($12,000.00) was also the lowest and best bid received; and <br />WHEREAS, Brandstetter Carroll Inc., the architectural firm retained to design and oversee <br />this renovation project, has reviewed all bids received and recommends that Council approve and <br />accept the base bid and alternate bid of Rycon Construction Inc. in the total amount of $308,500.00 <br />for said project; and <br />WHEREAS, a ten percent (10%) contingency is also requested to cover any unforeseen <br />conditions or changes requested by Mayfield Village. This contingency shall be in an amount not <br />to exceed $30,850.00. <br />BE IT RESOLVED BY THE COUNCIL OF MAYFIELD VILLAGE, OHIO, THAT: <br />SECTION 1. The Council of Mayfield Village hereby accepts and approves the base bid <br />and alternate bid of Rycon Construction Inc. in an amount not to exceed $339,350.00 and the <br />construction contract is hereby awarded to Rycon Construction Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.