My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022 18 ORDINANCE
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2022 Ordinances
>
2022 18 ORDINANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2023 8:24:19 AM
Creation date
3/6/2023 5:55:14 PM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
2022 18
Date
10/17/2022
Year
2022
Title
CHAPTER 1128 COMPREHENSIVE STORMWATER MANAGEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 <br />ORDINANCE NO. 2022-18 <br />Page 18 <br />requirements for stormwater quantity control for each watershed in the <br />development: <br />The peak discharge rate of runoff from the Critical Storm and all more <br />frequent storms occurring under post -development conditions shall not <br />exceed the peak discharge rate of runoff from a 1 -year, 24-hour storm <br />occurring on the same development drainage area under pre -development <br />conditions. <br />Storms of less frequent occurrence (longer return periods) than the <br />Critical Storm, up to the 100 -year, 24-hour storm shall have peak runoff <br />discharge rates no greater than the peak runoff rates from equivalent size <br />storms under pre- development conditions. The 1, 2, 5, 10, 25, 50, and <br />100 -year storms shall be considered in designing a facility to meet this <br />requirement. <br />The Critical Storm for each specific development drainage area shall be <br />determined as follows: <br />a. Determine, using a curve number -based hydrologic method or <br />other hydrologic method approved by the Village Engineer, the <br />total volume (acre-feet) of runoff from a 1 -year, 24-hour storm <br />occurring on the development drainage area before and after <br />development. These calculations shall meet the following <br />standards: <br />(1) Calculations shall include the lot coverage assumptions <br />used for full build out as proposed. <br />(2) Calculations shall be based on the entire contributing <br />watershed to the development area. <br />(3) Drainage area maps for both pre -developed and post - <br />developed conditions shall include area, curve number, and <br />time of concentrations. Time of concentration shall also <br />show the flow path and the separation in flow type. <br />(4) Use the Standard Rainfall Intensity — Duration Tables from <br />the Uniform Standards for Sewerage Improvements, Latest <br />Edition for stormwater design. <br />(5) Use the SCS Type 11 rainfall distribution for all design <br />events with a recurrence interval greater than 1 year. <br />Include lot coverage assumptions used for full build out of <br />the proposed condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.