My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022 09 RESOLUTION
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2022 Resolutions
>
2022 09 RESOLUTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 8:31:27 AM
Creation date
3/7/2023 11:03:56 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
2022 09
Date
2/21/2022
Year
2022
Title
COOP USE AGREEMENT WIWTH OHIO FACILITIES CONSTRUCTION COMMISSION
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: 1C143D5F-BE9C-4E34-9F91-5A3C3FB05EE8 <br />o approval by the Project Sponsor or Project Sponsor's representative for <br />payment; <br />o approval by the architect or construction manager, if applicable; <br />o current date; <br />o invoice number; and <br />o date of service. <br />(ii) copies of all approved change orders. Field work orders, construction <br />change directives, or similar charges, shall not be paid until change orders <br />are finalized and approved. <br />(c) When construction is complete, the following documentation shall be submitted <br />along with the summary sheet and supporting documentation: <br />(i) A cover letter signed and dated by an appropriate representative of the <br />Project Sponsor with his or her name and title printed thereon, containing <br />the following language: <br />"By signing below, I certify that the charges being invoiced are for actual <br />work completed on the Mayfield Village Civic Center Project, and the <br />charges are true, accurate and appropriate, and that no liens have been <br />filed on the Cultural Project or the Facility. I further certify that all work has <br />been done in compliance with all applicable laws, including but not limited <br />to prevailing wage law." <br />(ii) A copy of the Certificate of occupancy (if available) and/or photographs of <br />the completed project. <br />4. In accordance with the current capital bill, appropriations made for buildings and <br />structures, including remodeling and renovations, are limited to the following: <br />(a) acquisition of real property or interest in real property; <br />(b) buildings and structures, which includes construction, demolition, complete <br />heating and cooling, lighting, and lighting fixtures, and all necessary utilities, <br />ventilating, plumbing, sprinkling, water and sewer systems, when such systems <br />are authorized or necessary; <br />(c) architectural, engineering, and professional services expenses directly related <br />to the project; <br />(d) machinery that is a part of the structures at the time of initial acquisition or <br />construction; <br />(e) acquisition, development, and deployment of new computer systems, including <br />the redevelopment or integration of existing and new computer systems, but <br />excluding regular or ongoing maintenance or support agreements; and <br />Ce Page 13 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.