Laserfiche WebLink
[a <br />MAYFIELD VILLAGE, OHIO <br />PARKVIEW POOL PIPING REPLACEMENT PROJECT - PHASE I <br />Bid Tabulation Marchl8, 2022 <br />DENOTES ADDITION ERROR <br />22-611,,,11111re1Aru."Ai_ I,, BT -1 snxe0ez i ai Ani <br />The <br />Cianci Consturction <br />Group,LLC., <br />Inc. <br />Nerone an <br />Sons, ne. <br />12840 Laser Drive <br />235 East Water Street, Suite C <br />19501 S. Miles Road, Suite 1 <br />BIDDERS <br />Chesterland, Ohio 44026 <br />Lowellville, Ohio 44436 <br />Warrensville Heights, Ohio 44128 <br />216-390-0947 <br />440-729-2613 <br />(Fax) <br />36-6724 <br />330536-8274 (Fax) <br />216-662-2235 <br />216.662-5522(Fax) <br />DESCRIPTION <br />QNTY. <br />UNIT <br />LABOR COST <br />MATERIAL <br />UNIT PRICE <br />TOTAL <br />MATERIAL <br />UNIT PRICE <br />TOTAL <br />MATERIAL <br />UNIT PRICE <br />TOTAL <br />p <br />COST <br />COST <br />COST <br />K$5.25 <br />1 ITEM 608'. <br />4" CONCRETE WALK POOL DECK AS PER PLAN <br />3000 <br />SF <br />$4.00 <br />$4.00 <br />$8.00 <br />$24,000.00 <br />$5.25 <br />$10.50 <br />$31,500.00 <br />F$28.00 <br />$4.25 <br />$11.25 <br />$33750.00 <br />2ITEM <br />P C L' <br />1-1/2" CONDUIT, AS PER PLAN <br />140 <br />FEET <br />$20.00 <br />$7.00 <br />$27.00 <br />$3 780.00 <br />$12.00 <br />$27.00 <br />$3 780.00 <br />$12.00 <br />$62.00 <br />$8,680.00 <br />3ITEM <br />CAL'. <br />2" CONDUIT, AS PER PLANP <br />420FEET <br />$11.00 <br />$8.00 <br />$19.00 <br />$7980.00 <br />$15.00 <br />$30.00 <br />$12.600.00 <br />$12.00 <br />$40.00 <br />$16,800.00 <br />4 ITEM <br />SPECIAL: <br />3" CONDUIT, AS PER PLAN <br />420 <br />FEET <br />$18.00 <br />$13.00 <br />$31.00 <br />$13,020.00 <br />$17.00 1 <br />$18.00 <br />$35.00 1 <br />$14.700.00 <br />$28.00 <br />$16.00 <br />$44.00 <br />$18,480.00 <br />ITEM <br />4" CONDUIT, AS PER PLAN <br />5 <br />SPECIAL: <br />140 <br />FEET <br />$26.00 <br />$22.00 <br />$48.00 <br />$6,720.00 <br />$20.00 <br />$27.00 <br />$47.00 <br />$6,580.00 <br />$50.00 <br />$21.00 <br />$71.00 <br />$9,940.00 <br />6 ITEM <br />SPECIAL. <br />8" CONDUIT, AS PER PLAN <br />190 <br />FEET <br />$32.00 <br />$61.00 <br />$93.00 <br />$17,670.00 <br />$40.00 <br />$37.00 <br />$77.00 <br />$14.630.00 <br />$51.00 <br />$42.00 <br />$93.00 <br />$17,670.00 <br />7 ITEM <br />SPECIAL <br />10" CONDUIT, AS PER PLAN <br />300 <br />FEET <br />$39.00 <br />$151.00 <br />$190.00 <br />$57000.00 <br />$80.00 <br />$56.00 <br />$136.00 <br />$40,800.00 <br />$52.00 <br />$96.00 <br />$148.00 <br />$44,400.00 <br />ITEM <br />12" CONDUIT. AS PER PLAN <br />6 <br />SPECIAL <br />165 <br />FEET <br />$62.00 <br />$166.00 <br />$228.00 <br />$37,620.00 <br />$180.00 <br />$176.00 <br />$356.00 <br />$58.740.00 <br />$84.00 <br />$120.00 <br />$204.00 <br />$33,660.00 <br />ITEM <br />4" TRENCH DRAIN REMOVED AND REPLACED, AS <br />9 <br />SPECA: <br />PER PLAN <br />50 <br />FEET <br />$10.00 <br />$20.00 <br />$30.00 <br />$1500.00 <br />$40.00 <br />$37.00 <br />$77.00 <br />$3,850.00 <br />$93.00 <br />$45.00 <br />$138.00 <br />$6,900.00 <br />ITEM <br />PRESSURE TESTING OF REMAINING PIPING NOT <br />10 <br />P CIAL: <br />REPLACED UND R PHASE I A PER PLAN <br />LUMP <br />LUMP <br />$3,000.00 <br />$500.00 <br />$3,500.00 <br />$3,500.00 <br />$3,000.00 <br />$483.00 <br />$3,483.00 <br />$3,483.00 <br />$7,500.00 <br />$1,500.00 <br />$9.000.00 <br />$9,000.00 <br />ITEM <br />8" HYMAX®, A MUELLER BRAND, 2 COUPLING, AS <br />11 <br />SPECIAL-. <br />DIRECTED Y THEENGINEER <br />1 <br />EACH <br />$375.00 <br />$825.00 <br />$1.200.00 <br />$1,200.00 <br />$50.00 <br />$446.00 <br />$496.00 <br />$496.00 <br />$20.00 <br />$350.00 <br />$370.00 <br />$370.00 <br />ITEM <br />10" HYMAX®, A MUELLER BRAND, 2 COUPLING, AS <br />12 <br />SPECIAL. : <br />DIRECTEDV THE ENGINEER <br />2 <br />EACH <br />$375.00 <br />$1,200.00 <br />$1.575.00 <br />$3,150.00 <br />$50.00 <br />$581.00 <br />$631.00 <br />$1,262.00 <br />$25.00 <br />$465.00 <br />$490.00 <br />$980.00 <br />ITEM <br />12" HYMAX®, A MUELLER BRAND, 2 COUPLING, AS <br />13 <br />SPECIAL: <br />DIRECTED BY THE ENGINEER <br />i <br />EACH <br />$375.00 <br />$1,525.00 <br />$1.900.00 <br />$1,900.00 <br />$50.00 <br />$690.00 <br />$740.00 <br />$740.00 <br />$30.00 <br />$550.00 <br />$580.00 <br />$580.00 <br />ITEM <br />PRECONSTRUCTION VIDEO <br />14 <br />SPECIAL: <br />LUMP <br />LUMP <br />$250.00 <br />$250.00 <br />$500.00 <br />$500.00 <br />$800.00 <br />$63.00 <br />$863.00 <br />$863.00 <br />$900.00 <br />$0.00 <br />$900.00 <br />$900.00 <br />ITEM <br />DISCRETIONARY ALLOWANCE TO BE UTILIZED AS <br />15 SPECIAL: <br />DIRECTED BY THE ENGINEER FOR UNSCHEDULED <br />WORK ITEMS NOI'LON THET INCLUDED IN THIS PROPOSAL OR <br />SHOW PLANS <br />LUMP <br />LUMP <br />$25.000.00 <br />$25,000.00 <br />$25,000.00 <br />$25.000.00 <br />$251000.00 <br />$25,000.00 <br />DENOTES ADDITION ERROR <br />22-611,,,11111re1Aru."Ai_ I,, BT -1 snxe0ez i ai Ani <br />