Laserfiche WebLink
DocuSign Envelope ID: E51DEB19-2E3E-4E38-9388-222121EB727C <br />• When should the electrician perform his work? Once Flock installs the camera, you will <br />receive an email alert letting you know that this has been completed. After this, you will <br />need to schedule the electrician to route power to the pole. <br />• What if my electrician has questions about Flock's AC Kit? You should share the <br />AC -Power Kit Details packet with the electrician if they have questions. <br />• What if the AC power is on a timer? Sometimes the AC power will be on a timer (like <br />used for exterior lighting). Flock requires that the AC power provided to the camera be <br />constant. The source that the electrician uses must not be on a timing circuit. <br />14 <br />