Laserfiche WebLink
Exhibit 1 — Project total cost <br />MC SD ENTRY DRIVE <br />GENICON <br />SUPER <br />DUMPSTERS <br />SITE LAYOUT <br />TOILET <br />FINAL CLEANUP <br />TESTING ALLOWANCE <br />BOND <br />PERMIT ALLOWANCE <br />2200 <br />EARTHWORK <br />STONE BERM <br />2480 <br />LANDSCAPING, <br />2513 <br />ASPHALT PAVEMENT <br />3310 <br />CONCRETE <br />4200 <br />MASONRY <br />10400 SIGNAGE <br />16000 ELECTRIC <br />16300 SIGNALIZATION <br />PIOM <br />$C 00 <br />00 <br />T82.00 <br />