My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04.15.24 MEETING MINUTES
DOcument-Host
>
Mayfield Village
>
Meeting Minutes
>
2024
>
04.15.24 MEETING MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 11:10:19 AM
Creation date
5/24/2024 11:02:56 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Meeting Minutes
Date
4/15/2024
Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of the Regular Meeting of Council <br />Monday, April 15, 2024 <br />Page 5 <br />routing of the stream and to further expand its floodplain. We anticipate this second phase of the <br />project in Spring 2025. <br />• Aintree North and Sandalwood Sidewalk Replacement. <br />After completing a successful program to replace the sidewalks in Aintree Park during 2022, we followed <br />the same program in the Aintree North, SOM and Sandalwood areas in 2023. I am pleased to say that <br />most residents participated and all our residential sidewalks have now been repaired. The next area that <br />needs to be tackled is our business area on Beta Drive. We will address the sidewalks there next year as <br />part of the 2025 Road Program. <br />• 2024 Road Program. <br />This year's road project includes asphalt resurfacing, concrete curb and underdrain replacement <br />on Ridgebury Blvd within the Village Limits. We have budgeted $720,000 for this project and are <br />receiving $247,500 from the County's 50/50 Program. Mr. Cappello is preparing to go out for bids <br />and we anticipate that this work will begin in June. <br />• Fisher Park. <br />During 2023, Dominion/East Ohio Gas moved its measuring and regulating station from the east <br />side of SOM Center Road, at Thornapple, to the Village -owned property across the street behind <br />Cuoco Bella restaurant. The Village added landscaping, benches and signage to this property, <br />which had been designated as "Fisher Park" in 2019. All improvements were done by our Service <br />Department and plans are underway for some additional enhancements this year. <br />DEPARTMENTAL REPORTS. <br />The Parks & Recreation Department is excited about the upcoming summer season and the <br />addition of the permanent restrooms at The Grove. Director Shane McAvinew continues to work <br />his magic, booking bands to maximize his budget. Special events and programming, including <br />Senior Programs, are more robust and popular than ever. <br />At the Building Department, work continues at the Montebello subdivision on Highland Road <br />with 20 homes already occupied and six new homes built during 2023. <br />The estimated value for residential construction increased in 2023. It was $4.3 million compared <br />to $3.9 million in 2022. Building permits issued in 2023 decreased to 624 from 685 in 2022. <br />On the commercial side, the number of permits issued last year was up; 206 in 2023 compared to <br />172 in 2022. <br />Finance Department. As you know, every time I have the opportunity, and I will be running out <br />of opportunities shortly, I always like to mention that our Finance Director Ron Wynne has done <br />an amazing job in guiding the Village throughout his career here, but particularly over these past <br />few pandemic years. This year, Ron is retiring effective May 31 st. We appreciate all that Ron has <br />
The URL can be used to link to this page
Your browser does not support the video tag.