Laserfiche WebLink
plain how the success of your project will be measured and evaluated. Examples Include, but are not limited to, amount of salt tracked and applied, <br />ount of salt reduced, contamination reduction with facility upgrades, etc. <br />If more space is needed please add additional sheet labeled with question head <br />principal function of the salt dome is to keep separate the salt pile and the environment. <br />project will be a success when: <br />1. The roof is replaced, gutters and downspouts are installed. <br />2. Rainwater, snow and ice no longer collect in the enclosure. <br />Salt/saltwater no longer drains from the building into surrounding storm catch basins and watersheds. <br />H2Ohio Rivers Chloride Reduction Grant <br />Page 6 of 7 12/8/2023 <br />�iQ`•� Environmental H2Ohio Rivers Chloride Reduction Grant <br />J� Protection Organization: Village of Mayfield <br />Agency <br />Funding Source Acknowledgement <br />L <br />