My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 045 RESOLUTION
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2024 Resolutions
>
2024 045 RESOLUTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 12:43:57 PM
Creation date
3/4/2025 12:43:00 PM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
2024-45
Date
8/19/2024
Year
2024
Title
SALT DOME ROOF REPLACEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I �f.—j! M <br />Mayfield Village, Ohio <br />Civic Center <br />6622 Wilson Mills Road <br />Mayfield Village, OH 44143 <br />Attn: Frank Stupczy <br />Contact* (440) 8232-4434 <br />Email fstupczy@mayfieldvillage.com <br />August16,2024 <br />Re: New Durso -Last Prefabricated Tan PVC Roof System for the Salt Dome Located 0 734 SOM Ctr Rd. Mayfield, OH <br />44143 <br />hM%9kp—dcqfzAiMMWt EF>netingRoof Conditions <br />The edsdtag roof consists of a wood deck, tar paper, and asphalt shingles The dating shingles are aged, shingles <br />are and areas of the decking are damaged. <br />Damschmder Roofing Professional R ecommendations: <br />k is recommended that this Bair dame be recovered with a new tan Dam -Last Prefabricated PVC Roof System to <br />dimbate any danmagelshmgle blow -off and prevent leaks. <br />Oar Pmp_gsal/Scgpe of Work: <br />L Remove and dispose of the existing dormer on the roof and install new wood decking. <br />2. Remove and dispose of all east % drip edges amend the entrance of the salt dome perimeter roof edges. <br />3. Remove and dispose of all existing vents around peak (20). <br />4. Install a W Dum-Guard XPS separator sheet over entire roof arras and on entrance side parapet walls for proper <br />installation of the Dino -Last Roof System. <br />5. install new tan .050 Dann -Last Prefabricated PVC Membrane over the entire roof deck up and over all parapet <br />w�a ll �far 0Wlete including all necessary vents, flashings, and terminations according to <br />manufacturer specifications (this includes using stainkss steel fasteners). <br />6. Installl twenty breather vents in place of the roof vents that were removed. <br />7. Install a new 1314' vinyl bar and stainless -steel cover around all perm roof edges and down the verticals of the <br />entrance of Salt Dome. <br />8. install new 4' 2 pc. universal fascia with stainless steel cover at the non-gumer roof edges of the entrance (Standard <br />Kynar color to be selected by owner). <br />NW <br />ra.a.ay. cooaa: Roes <br />
The URL can be used to link to this page
Your browser does not support the video tag.