My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1969 008 Ordinance
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
1968-1970 Ordinances
>
1969 008 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 3:57:05 PM
Creation date
8/13/2018 6:56:09 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Ordinance
Number
008
Date
2/17/1969
Year
1969
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i~~ <br />ORDINANCE N0. 1969-8 <br />BY: MR. FITZ-GERALD <br />AN ORDINANCE PROVIDING FOR THE EMPLOYAfENT OF AN ENGINEER <br />FOR THE VILLAGE OF HAYFIELD. <br />BE IT ORDAINED BY THE COUNCIL OF THE VILLAGE OF HAYFIELD, CUYAHOGA <br />COUNTY, OHIO, THAT: <br />Section 1. Stephen Hovancsek is hereby employed and appointed as <br />Engineer for the Village of Mayfield until December 31, 1969, such employment <br />to be terminable by either the Village or said Engineer upon 90 days written <br />notice to the other. However, all work, if same is being processed in a manner <br />satisfactory to the Village, shall be completed by the Engineer and the services <br />therefor paid by the Village, in accordance with the terms hereof. <br />Section 2. Said Stephen Hovancsek shall be compensated as follows, <br />and the Mayor and the Clerk are hereby authorized to enter into an Agreement in <br />writing with said Stephen Hovancsek whereby he will be paid on the following <br />basis: <br />(a) If the proceedings for any improvement are completed <br />according to the usual schedule, as provided by law, so that the bids are received <br />and a contract is awarded, he shall be paid a sum equal' to seventy-five percent <br />(75%) of the amount listed in Section 2(b); as the work progresses, he shall <br />receive additional compensation equal to the balance of the fee listed in Section <br />2(b); said sum to be paid at the time the contractor's estimates, upon which his <br />payment is based, are presented for payment. Before the final estimate for the <br />work is issued, any adjustment shall then be made so that the total fee paid him <br />shall be equal to the percentages listed in Section 2(b). <br />(b) That for such services in connection with construction <br />of public improvements, he shall receive compensation on a percentage for the <br />actual cost of construction of all improvements made by the Council and under <br />their control. The percentage paid shall be in accordance with the following <br />schedule, based upon the Minimum Fees for General Engineering Services recommended <br />by the Ohio Society of Professional Engineers in their publication, "Code of <br />Professional Practice," as revised in 1967. <br />General Engineering Projects - Schedule 1 <br />Airports and Facilities <br />Bridges and Grade Separation <br />Structures <br />Foundations <br />Dams and Hydraulic Structures <br />Highways and City Streets <br />Incinerators <br />Intercepting, Relief, Storm or <br />Sanitary Sewers <br />Outside Electrical Installations <br />Power Plants <br />Pumping Stations <br />Railway and Bus Terminals <br />Electrical Transmission and <br />Distribution Facilities <br />Tunnels and Caissons <br />Ground or Underground Water <br />Storage Facilities <br />Waterfront and Terminal <br />Improvements <br />Water, Sewage and Industrial <br />Treatment Plants <br />Water Intakes and Sewage <br />Outlets <br />
The URL can be used to link to this page
Your browser does not support the video tag.