Laserfiche WebLink
ORDINANCE NO. 2017-38 <br />INTRODUCED BY: Mayor Bodnar and Council as a Whole <br />AN ORDINANCE <br />AMENDING SECTION 1309.04 OF THE CODIFIED ORDINANCES <br />RELATIVE TO THE LUMP-SUM PERMIT FEES <br />ASSOCIATED WITH THE CONSTRUCTION OF NEW DWELLINGS <br />WHEREAS, it has become necessary to amend Codified Ordinance Section 1309.04 of the <br />Codified Ordinances relative to lump sum permit fees associated with the construction of new <br />dwellings in order to update such fees to better reflect current applicable costs; and <br />WHEREAS, Village Council deems it in the best interest of the Village and its residents to <br />amend Codified Ordinance Section 1309.04 as set forth below. <br />NOW, THEREFORE, BE IT ORDAINED by the Council of the Village of Mayfield, <br />County of Cuyahoga and State of Ohio: . <br />SECTION 1. That Section 1309.04 of the Codified Ordinances of the Village of Mayfield is <br />hereby and herein amended as follows: <br />1309.04 LUMP SUM PERMIT FEES; EXCEPTIONS <br />(a) Single-Family Dwelling. For construction of a new single-family dwelling, <br />a total lump sum permit fee of s~r~ one thousand four hundred dollars <br />($~-AA1,400.00) shall be charged for all permits issued pursuant to the original <br />plans as approved. This will include the cost of all permits issued for <br />construction, heating and air conditioning, plumbing and electrical work, <br />certificate of occupancy and final inspection. <br />The permit holder/sub-contractors shall be required to obtain permits for <br />the separate portions of the work herein after described and shall insure <br />necessary inspections and approvals are given, however, no separate permit fee <br />shall be paid. The lump sum permit fee shall not include the cost of a permit for <br />the construction of accessory buildings. <br />(b) Two-Family Dwelling. For construction of new two-family dwellings the <br />same provisions will apply as provided in subsection (a) hereof pertaining to <br />single-family dwellings, except that the lump sum permit fee for each two- <br />family dwelling shall be ~~ two thousand eight hundred .dollars <br />($4992,800.00). <br />(c) Multi-Famil~partment Building. For construction of all multi- <br />family/apartment buildings, the same provisions will apply as provided in <br />subsection (a) hereof pertaining to single- family dwellings, except that the lump <br />sum permit fee for each separate building there shall be added en€ two hundred <br />dollars ($-f8~-09200.00) for the first floor plus °°•~°~~e one hundred fifty <br />