My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 53 RESOLUTION
DOcument-Host
>
Mayfield Village
>
Ordinances Resolutions
>
2023 Resolutions
>
2023 53 RESOLUTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 10:16:22 AM
Creation date
8/24/2023 10:06:33 AM
Metadata
Fields
Template:
Legislation-Meeting Minutes
Document Type
Resolution
Number
2023 53
Date
8/21/2023
Year
2023
Title
WORTON PK CULVERT CHANGE ORDER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION 2023-53 <br />INTRODUCED BY: Mayor Bodnar <br />AN EMERGENCY RESOLUTION <br />AUTHORIZING MAYFIELD VILLAGE TO APPROVE A CHANGE ORDER <br />IN AN AMOUNT NOT EXCEED TO $35,000.00 TO COMPLETE <br />ADDITIONAL CHANNEL WORK FOR PHASE 1 OF THE <br />WORTON PARK CULVERT REPLACEMENT PROJECT <br />WHEREAS, it has been deemed in the best interest of the health, safety and welfare of all <br />Village residents and inhabitants to replace and increase the size of the culverts on Worton Park <br />Drive and N. Woodlane Drive and perform additional channel and flood plain enhancements to <br />reduce flooding in the Worton Park neighborhood; and <br />WHEREAS, bids for the aforementioned improvements were received, opened and <br />tabulated as per published notice on May 13, 2022; and <br />WHEREAS, the bid of Great Lakes Crushing, Ltd. in the amount of $873,113.00 was the <br />lowest and best bid received; and <br />WHEREAS, the Village Engineer, who prepared the design and bid specifications for this <br />project, reviewed the bids and recommended that Council approve and accept the aforementioned <br />bid; and <br />WHEREAS, the Village entered into contract with Great Lakes Crushing Ltd. for culvert <br />replacement on Worton Park Drive and N. Woodland Drive in accordance with the specifications <br />contained in the bid documents; and <br />WHEREAS, at this time additional channel work is being proposed to improve the <br />functionality of the flood plain installed at 6213 N. Woodlane; and <br />WHEREAS, the Village Engineer has reviewed the proposed change order, and <br />recommends that the Village approve the change order in an amount not exceed $35,000.00 in <br />order to complete additional channel work. <br />NOW, THEREFORE, BE IT RESOLVED by the Council of the Village of Mayfield, <br />County of Cuyahoga and State of Ohio: <br />SECTION 1. The Council of Mayfield Village, based upon the recommendation of the <br />Village's Engineer, hereby approves a change order to its contract with Great Lakes Crushing Ltd. <br />for Phase 1 of the Worton Park Culvert Replacement Project, to perform additional channel work <br />to improve the functionality of the flood plain, in an amount not to exceed $35,000.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.