My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/26/1994 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
1994
>
1994 Architectural Review Board
>
04/26/1994 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:32:44 PM
Creation date
1/29/2019 8:05:06 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
1994
Board Name
Architectural Review Board
Document Name
Minutes
Date
4/26/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
center. He also agreed to add some height to the entrance area: Mr. Sohn agreed <br />that this would be satisfactory. Y.. Sohn moved to approve the changes as <br />suggested by the architect: that there could be a 32 to 4 foot high concrete <br />block wainscot, but the three elevations (except the east elevation) should be <br />brick masonry walls up to the accent ba.nd (about 10 feet high) the brick could <br />stop on the south elevation about 40 feet from left end (at the start of the <br />steel preset forms). Ztao feature wall above the entrance on the west elevation <br />should be raised up to 4 feet or height to give a strong architectural statement. <br />In other words to break up the monotonous horizontal line and to emphasize the <br />central location of the entrances. The colors of the brick should match the <br />colors as presented, and should stay in the same tones. Tne samples of the brick <br />and an elevatian should be presented to the Planning Commission and forwarded to <br />the Board for approval. Also the previous recommendations for the brick wall <br />should be considered part of this motion, seconded by B. Zergott, and unanimously <br />approved. After the motion, Mr. SoYin clarified that the brick should be <br />installed up to the accent band and 4 feet of height should be added over the <br />entrances. <br />VI. ADJOURNMIINT : <br />The meeting was adjourned at 7:45 p.m. <br />? <br />B, rg0Ct, q irman B. Oring,
The URL can be used to link to this page
Your browser does not support the video tag.