My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/14/1996 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
1996
>
1996 Planning Commission
>
05/14/1996 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:33:14 PM
Creation date
1/29/2019 9:00:20 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
1996
Board Name
Planning Commission
Document Name
Minutes
Date
5/14/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
? <br />/ <br />CITY OF NORTH OLMSTED <br />PLANNING COM1kIISSION <br />MIlVUTES - MAY 14, 1996 <br />I. ROLL CALL: <br />Vice-chairman Mawiing called the meeting to order at 7:45 p.m. <br />Present: D. Cameron Alston, T. Brennan, T. Herbster, A. Manniug and K O'Rourke. <br />Chairman Tallon arrived shortly after the meeting started. <br />Absent: R. Koeth <br />Also Present: Assistant Law Director Dubelko, Build.ing Commissioner Conway, Assistant City <br />Engineer McDermott, and Clerk of Commissions Oring. <br />II. REVIEW AND CORRECTION OF NIINUTES: <br />A. Manning moved to approve the minutes ofApril 30, 1996, seconded by T. Brennan. Roll call on <br />motion: Manning, Brennan, Herbster, and O'Rourke, yes. Ms. Cameron Alston, abstained. <br />III. BLTII.DING DEPARTMENT REQLTESTS: <br />1) Great Northem Dodge, 26100 Lorain Road. <br />Project number 1: Proposal to construct an addition joining the showroom and the service <br />building. <br />Previously approved by planniug commission Ju1y 26, 1994. <br />Project number 2: Proposal to construct new bu.ilding and revision to site plan and drainage. <br />Properties should be combined. . <br />Note referral to architectural review board is required. <br />Mr. Shartman, owner, Mr. Hitchcock, contractor for project number 1 and Mr. Nichol, engineer for <br />project number 2, presented the plans. Mr. Shartman eacplained that they have a water problem in the <br />back of the property. Mr. Nichol explained that they wanted to pave the parking lot in the back, install a <br />retention facility, catch basins and outlets in order to drain the northwest corner of the property to an <br />existing ditch. Assistant City Engineer McDermott advised that plans have been submitted, but they <br />have not done a final review, but the plans seem feasible; however, some additional information may be <br />needed on the adequacy of the receiving ditch. Mr. Shartman would like to build Project number 1, <br />which had been approved over a year ago, since it is necessary to eapand their service area. He clarified <br />that there is a 60 foot wide lot that is on the back and side of their property which is leased and is <br />owned by the former owner of the property. It was noted that the storage building for lawn mowers or <br />parts, shown on project number 2, goes over the property line. Building Commissioner Conway advised <br />that he has had complaints regarding this business storing cars on the grass, and he had suggested that <br />they add the paving, and with this plan there should not be a parking problem, since they can stack cars <br />that are being stored. Mr. Shartman clarified that the entire lot will be paved. Mr. Conway needs a <br />revised site plan that will reflect the entire site, at this point there are two separate site plans, one <br />showing the addition, but the plan for project number 2 does not accurately reflect what is on the site, <br />parking, loading zones, dumpsters, or the proposed addition, it only shows the paving and new storage <br />building. Mr. Shartman agreed to have the plans revised. Mr. Hitchcock would like approval on project <br />number 1 since it was approved originally and the comments that were made at that time will be <br />incorporated into the plans. Mr. Conway advised that variances will be needed for project number 2,
The URL can be used to link to this page
Your browser does not support the video tag.