Laserfiche WebLink
I. <br />_ Y. <br />retail developinent; the Saturday figures are higher at the intersections with a retail development, but <br />they are not as high as the evening peak hour with the exception of the Wal Mart entrance. The next <br />chart described the level of service rated from "A" to "F" with "A" being superior and "F" being the <br />poorest at the intersections that were studied. The following chart showed the existing leveLs of sexvice <br />at these intersections during the p.m. peak hour and the Saturday peak hour without new development <br />and without any traffic improvements. The third chart showed the level'of service projected for 1998 <br />without addition development and without improvements which showed very little change, except for <br />Brookpark and Columbia (estimated at a six percent growth rate). The fourth chart estimated the daily <br />traffic volumes with the proposed development, includ.iug weekday morning peak hours, evening peak <br />hours, and Saturday peak hours. Mr. Wentzell explained that North Olmsted was in the process of <br />upgrading the traffic signal system within the city and they had eonsidered this when doing the study for <br />both the office and retail impact. They also considered the roadway improvements for additional lanes <br />which they are recommend.ing for the retail development. This study concluded that an office complex <br />would have a similar or greater impact upon weekday peak hour traffic, which is when the highest <br />traffic volumes occur on Brookpark Road. He explained the road improvements that they planned: <br />signal improvement at Brookpark and Great Northern which will provide additional left turn phases; the <br />medium widths of the median strip on Brookpark will be reduced to 4 feet to allow left turns as <br />recommended by O.D.O.T: the left turn lane at Brookpark and Great Northern will be extended; new <br />left and right turn lanes will be added, and the traffic signal will be re-phased to allow for those turns at <br />the Wal Mart/access drive to this retail development; a right turn in and out drive onto Brookpark <br />Road, will be added; and a new right turn lane and extended left turn lanes on east and west approaches <br />along with revised traffic signal phases will be addecl at Brookpark and Columbia Roads. He believed <br />that these improvements would inaintain, or even improve, the current levels of service even if the <br />traffic volumes increase. Mr. Richardson advised Mr. Manning that they planned to pay for these <br />proposed improvements. He presented various illustrations showing the proposed site and the abutting <br />property, and advised that they would be deeding 40 foot oftheir land to the adjacent residents, but, if <br />any resident did not want the additional property, they would give them a perpetual easement. He <br />explained they hired a certified appraiser to study the adjacent property to determine the impact on <br />these homes by the retail development, who concluded that this development would have no negative <br />impact on the adjacent properiy values. He advised the neighbors that they would provide copies of the <br />appraisal. Mr. Bader, architect and landscape architect, explained the site plan. He advised that, because <br />of the residents previous objections, they have eliminated the proposed restaurant from the plans, and <br />there will be no restaurant on this site. T`he largest building shown at the eastern end of the property will <br />be a Home Depot, a major retailer with 53,000 square feet will be in the center of the site; arid two <br />other retail buildings, 23,000 and 26,000 square foot respectively, will beat the western portion of the <br />property. He clarified that there were some quality trees within the buffer zone, and some which need to <br />be removed; they will add trees and re-landscape the entire buffer along Westview and MitchEll Drives <br />and Columbia Road. They intend to use varied plant materials that will create the largest screening for <br />the development and would put in larger sizes than was agreed upon with the rezoning. They will do a <br />complete tree survey, protect the existing trees, and supplement them with new growth. He pointed out <br />the line that depicted a 6 foot board on board which will border the residential properiy, but it has been <br />moved in 40 feet, but that could always be varied to give a more aesthetic appearance. They are willing <br />to do mounding on their side of the property to protect the buffer. Parking lot landscaping and <br />mounding will be installed along with landscaping along Brookpark Road with flowers detailing the <br />entries into the project. They intend to keep the service facilities facing Brookpark Road and screening <br />them with landscaping to keep many of the service areas away from the residents. He pointed out that <br />they are maintaining the office building setback of 100 feet, which is deeper than the normal retail <br />setback. The 55 foot berm, required with the rezoning, has been extended to 75 feet, they will add at <br />6