My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/09/1997 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
1997
>
1997 Planning Commission
>
12/09/1997 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:33:39 PM
Creation date
1/29/2019 9:37:05 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
1997
Board Name
Planning Commission
Document Name
Minutes
Date
12/9/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ . <br />? ,. ,. <br />,. ._ <br />CITY OF NORTH OLMSTED <br />PLANNING. CONIlVIISSION <br />MINUTES - DECEMBER 9, 1997 <br />i. ROLL CALL: <br />Chairman Tallon called the meeting to order at 7:40 p.m. <br />Present: T. Brennan, T. Herbster, A. Manuing, K. O'Rourke, and R. Tallon. <br />Absent: Ms. Cameron ALston and Mr. Koeth <br />ALso present: Assistant Law Director Dubelko, Assistant City Engineer McDermott, Bu.ilding <br />Commissioner Conway and Clerk of Commissions Oring. <br />II. REVIEW AND CORRECTION OF MINUTES: <br />R. Tallon corrected the minutes of November 25, 1997 by removing Mr. Koeth from the vote of the <br />first Building Department Request (Mr. Koeth was not present). R. Tallon moved to adopt the minutes <br />of November 25, 1997 as corrected. The motion was seconded by K. O'Rourke, and unanunously <br />approved. <br />III. BUII.DING DEPARTMENT REQUESTS: <br />1) Developers Diversified Rea1ty Corporation <br />25853 thru 26429 Crreat Northern Shopping Center and 5078 thru 5194 Grreat Northern Plaza South. <br />Proposal to construct phase two in Great Northern Shopping Center which will include the demolition <br />of several units and the new construction of several units, one of which is over 100,000 square feet and <br />is considered a"superstore". Proposal will also include store front renovations to the remaining units. <br />Referral to the board of zoning appeaLs is required. <br />Continued from meeting of November 25, 1997 <br />Mr. Barrow, Developers Diversified Realty Corporation, operators of Great Northem Plazas, presented <br />revised plans to the members. He re-capped what had been explained before, the renovation and re- <br />tenanting of the plazas, the demolition and reconstruction of significant portions of the existing center, <br />and the redevelopment of the remaining elevations. This proposal had been continued to answer <br />questions that were raised previously and they have presented a landscaping and buffering plan to board <br />of the condominiums located behind the shopping center. He introduced Mr. Herschman and Mr. <br />Sherry, architects, and Mr. Knight, landscape architect, all of whom will be addressing the issues <br />brought up at the last meeting. Mr. Herschman presented a material board showing the brick and <br />explained that they would be-continuing the pattem started at the Home Place store with a combination <br />of the masonry material, colored concrete sidewalks with a pattern, non illuminated awnings over the <br />units in three subtle colors. The materials in the sign band areas will be concrete stucco, E.F.I.S. <br />systems, with individual letters for the signs; the store fronts will be alumiuum with details in the brick <br />areas; halo type bu.ilding lighting; the new construction in the rear will be treated as a front with the <br />masonry units designed in a pattern; indirect security lighting in the rear will be directed down; there <br />will be benches and receptacles along the front. Basically they will be using the same theme that was <br />used in Home Place, but it will be in different proportions with different set-ups to eliminate a sameness <br />in the center. Chairman Tallon would like to discuss the lighting later on. Mr. Barlow explained that <br />they just finished the parking count from surveys and title documents but have not had a chance to <br />submit these to Building Commissioner Conway for his review. He clarified that there are several <br />parcels of parking, one parking lot shared with Finast, other areas separated by arterial routes, parking <br />in the rear, and one remote area along Lorain Road. Mr. Sherry explained that they surveyed the <br />buildings to verify the actual square footage because their records did not seem to be accurate. Plaza
The URL can be used to link to this page
Your browser does not support the video tag.