My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/28/1982 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
1982
>
1982 Planning Commission
>
12/28/1982 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:34:43 PM
Creation date
1/30/2019 7:19:02 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
1982
Board Name
Planning Commission
Document Name
Minutes
Date
12/28/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLANNING COMMISSION DECEMBER 28, 1982 PAGE 2 <br />(3) Peeorrelli and Conti Hair Design (Mongello and Assoc.), <br />25796 Lorain Rd. <br />Proposal to construct hair design studio and lease offices. <br />(Heard by the Architectural Board of Review 12/22/82). <br />Plans were studied in conjunction with the Architectural Board's <br />four recommendations. Regarding the first recommendation, <br />Mr. Leo of Mongello and Associates, stated that the greenhouse <br />enclosures are purchased in moduals and that the nexr shortest <br />would be 32" below the cedar peak, and he does not believe that <br />that design will be effective. There were no structural reasons <br />for the Architectural Board's recommendatione Mr. Leo also is <br />in disagreement with the second recommendation to cover the ex- <br />isting stone with cedar siding. The Commission agrees that the <br />cedar siding on the.existing building will improve the appearance <br />of the building. Mr. Leo is in agreement with the third recom- <br />mendation (deleting the cedar on the west elevation and capping <br />the removed brick wing wall with the wood trim; and he also <br />agrees withthe four-th recommendation(reshingling the western <br />roof of the existing garage with new roofing to match the new <br />portion). T. Morgan moved that the proposal to renovate the <br />exisitng dwelling for the Pecorrelli and Conti Hair Design <br />building be approved with the recommendations of the Architectural <br />Board of Review as contained in the excerpts of the Minutes of <br />December 22, 1982 witli the exception of Item 1, wherein the western <br />most greenhouse be either raised above the angled roof line or <br />dropped below the peak of the westerly roof line approximately <br />2', be deleted; and recommends that the original plans showing <br />the western most greenhouse at the same peak (same elevation) be <br />retained, seconded by B. Gorris, and unanimously approvedo <br />IV. NEW DEVELOPMENTS: <br />No Items <br />V. COMMCTNICATIONS: <br />Letter from Ohio Department of Mental Retardation relative to the <br />West Haven Foundation group homes, asking for any comments or ob- <br />jections that the Commission might have. The Commission decided <br />to send the minutes of the hearings pertaining to West Haven. <br />VI. NEW BUSINESS: <br />No Items <br />VII. OLD BUINESSS: <br />Regarding Springvale Country Club Public Service sign, continued <br />from December 14, 1982 in order to receive an opinion from the <br />Law Department, Assistant Law Director Dubelko advised that the <br />principals should proceed through Planning Commission with de- <br />tailed drawings and an exact location of the proposed sign, as well <br />as having legislation introduced by either a councilmember or <br />the Mayor since permission to use public land must be approved <br />by Ordinance. A copy of. tiieseminutes will be sent to Mr. Shep Af
The URL can be used to link to this page
Your browser does not support the video tag.