Laserfiche WebLink
ARCHITECTURAL BOARD OF REVIEW SEPTEMBER 14, 1981 PAGE 2 <br />NOTE TO BUILDING DEPARTMENT: Mr. Parry stated that there are num- <br />erous pennants and banners all up and down Lorain Rd. which are <br />illegal according to the new Sign Ordinance. He requests that the <br />Building Department have those removed, and suggests that City <br />Council hi]?.e enough personel to enforce the Ordinances. <br />IV. OLD BUSINESS: <br />Hennie Homes Multifamily Development <br />No. representative present. <br />V. NEW BUSINESS: <br />(a) Danny Boy Farm Market Addition, 24579 Lorain Rd. <br />Mr. Romp, owner, and Mr: Geisser, Attorney, explained the plans. <br />This will be a 4,200 sq., ft. addition to expand the delicatessen <br />and check but areas. The loading dock will be extended out. <br />The addition will match the existing, brick and cedar with ? <br />shake shingles. A tree in the middle of the parking lot will <br />be removed so that extra parking can be added. The adjacent <br />neighbors' claim that there was parking on the buffer zone is <br />not valid since, according to the ordinance, the parking lot <br />could be extended to the property line since that property is <br />all zoned general retail. It was also stated by Mr. Romp that <br />the plans for the previously proposed office building have been <br />abandoned. R. Parry moved to approve the Danny Boy's Farm <br />Market plans as presented, seconded by S. Ebin, and unanimously <br />approved. <br />VI. (b) Church of St. Clarence Parish Center, 30106 Lorain Rd. <br />Tim Quinn, the contractor, explained that this is Phase I for <br />the multi-purpose building. This will be a pre-engineered, <br />metal building wi.th canyon gold walls and a metal, reflective <br />white roof. The front wi11 have two brick panels with vertical <br />aluminum siding and bronze trim on the windows and doors. <br />Originally the building was to have been finished with brick <br />veneer, but because of financial problems, they cannot do this <br />at this time. It is estimated that Phase 11 will be started in <br />about 2 years and this section will wrap around the metal <br />building on three sides with the brick finish. The peak will <br />then be finished with cedar siding. The metal roof will even- <br />tually be firred and shingled. The Board suggested that an- <br />other color on the walls would offer more contrast and that the <br />white roof would be too visable from Lorain Rd. The site plan <br />has had approvals and the parking lot is completed. R. Parry <br />moved to approve the Church of St. Clarence Phase I, the metal <br />building as an interium facia material until such time as the <br />future phases will add brick to the walls with the recommendation <br />that the canyon gold metal wall panels be replaced with the <br />American Builders sand tan, and also they should consider usina,