My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/13/2011 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2011
>
2011 Planning and Design Commission
>
04/13/2011 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:47:40 PM
Creation date
1/25/2019 7:59:56 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2011
Board Name
Planning & Design Commission
Document Name
Minutes
Date
4/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
existing planters will be upgraded as well. The waste disposal area will be cleaned and <br />organized and all utilities will be placed underground. <br />Mr. Rerlco asked what was being done with the old Saturn building. Mr. Stoyanov said the <br />building will be used for offices while the new building renovations are being completed. It will <br />then become a service garage. Mr. Rerko asked that the rear of the lot be cleaned and any <br />damaged sections of asphalt be repaired, cut, patched, sealed and restriped. Mr. Malone said he <br />would like to see more variety in the landscaping plan. The majority of the plants scheduled to <br />be used are groundcover plants. He would like to see more shrubs both evergreen and deciduous <br />to add texture and color differences. The center wedge shaped landscape area with cotoneaster at <br />the entranceway feeds into an area between the sidewalk and display pads which should be grass <br />for consistency and easy care. The north area once cleaned could have winter-creeper planted as <br />it is hardy. He asked how many cars were to be on the display pads and Mr. Stoyanov said they <br />are designed for 2 each. Mr. Bohlmann questioned the brick pavers to be used. Mr. Stoyanov <br />said the pavers are being added along each egress point to eliminate the ruts created by delivery <br />trucks. Mr. Bohlmann said the north and east property lines should have continuous concrete <br />curbing to maintain stormwater on the site and asked and about the dumpster enclosure. Mr. <br />Stoyanov said the enclosure will be brick to match building with wood gates. Mr. Parry asked <br />about the temporary buildings noted on the plans. Mr. Stoyanov said they were temporary <br />modular offices which will be removed upon occupancy. <br />Significant discussion toolc place regarding lighting. Mr. Parry felt the lack of lighting in the rear <br />of the lot poses safety concerns, while the frontage is too brightly lit. 1VIr. Frye said that the new <br />cars are displayed in the showroom and display areas. In order to have the lighting needed in <br />front the back lights are compromised to meet lot average. Mr. Parry suggested reworking site <br />lighting for safety. Mr. Frye said he would be willing to put more lights along the back but he <br />can not concede to giving up the lighting in the front. The commission was not comfortable with <br />the irregularity of lighting. Mr. Mitchell requested the light bulb wattage be reduced. The <br />inajority of the members felt that the front spillage was too high and requested lower wattage <br />bulbs and perhaps a few lights along the rear. Mr. Parry pointed out that a variance was granted <br />for site average readings of 6.4 fc so safety could be provided along the back and visibility along <br />the front. Mr. Frye said he did not think the cost to change lamps was warranted. Mr. Bohlmann <br />said there should be continuous curbing along the east property line which Mr. Frye agreed to do. <br />Mr. Malone moved, seconded by Mr. Peepers, to approve the proposal for CMS11-09: <br />Sunnyside Toyota of 26890/27000 Lorain Road with the following conditions: <br />1. The northern property line to be cleaned and all debris removed; if applicants own the <br />fence, at is to be removed. <br />2. A continuous concrete curb is to be installed along the eastern property line. <br />3. The landscape plan will be revised to include more variety and submittecl <br />administratively for approval <br />4. Wooden gates will be installed for the dumpster, oil and tire enclosures. <br />5. Lighting is to be added to rear of the lot for security. <br />The motion was approved 5-0.
The URL can be used to link to this page
Your browser does not support the video tag.