My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/23/2011 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2011
>
2011 Planning and Design Commission
>
02/23/2011 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:47:40 PM
Creation date
1/25/2019 8:01:17 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2011
Board Name
Planning & Design Commission
Document Name
Minutes
Date
2/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Wenger said the proposal consists of a building addition and site improvements to the <br />former Sunoco station for a new Sunoco station. The former auto service area will be converted <br />and expanded into a food service and sales area. The addition is located on the east side of the <br />building, which will match the existing brick and carry around the decorative band. A new <br />storefront system is proposed in addition to new awnings. The two Clague Road curb cuts will <br />be eliminated and one will be installed which will be full access. The two Lorain Road curb cuts <br />will reinain. Brick pavers will be added to the right-of-way area along Lorain. New plantings <br />are proposed in existing and expanded landscaped areas. Green space is being added along <br />Clague Road, the rear property line and the eastern property line. Landscape irrigation is <br />provided. A new masonry dumpster enclosure is proposed. A new ground sign is proposed. <br />Due to existing site constraints, a number of variances are requested. The building addition <br />causes variances for rear building setback and from 1165. The addition of a dumpster enclosure <br />causes variance for side yard setback. The rest of the variances are due to existing conditions, <br />wherein the applicant is actually improving upon the existing condition by adding greenspace <br />where asphalt currently exists. Overall, this project represents an improvement to the existing <br />site; therefore, she supports the variances that are requested. <br />Mr. Mitchell said prior to this redevelopment request the property was an abandoned gas <br />station. Although the previous owner did a good job of maintaining the site and minimizing <br />property maintenance issues, the renovation will be a welcome improveinent. <br />Mr. Kollab said he is excited to move into this location in North Olmsted and intends to work <br />with city officials. Mr. Rerko said all changes requested at the pre-planning meeting have been <br />made. He asked for clarification regarding tlie banding. Mr. Kershaw said the entire band, old <br />and new, will be repainted to match proposed rendering. Mr. Rerko recommends that at the <br />west elevation, where it terminates, the banding be brought back into the building and capped. <br />Mr. Kershaw confirmed the banding will continue around to the rear of building so that the <br />band will be seen from the rear parlcing lot; not the roof. However, the band will not run around <br />the back of the existing building on the northwest corner. Mr. Malone said all changes <br />requested at the pre-planning meeting have been made; there are no additional landscape issues. <br />He noted that the location and angle of the dumpster enclosure makes the most sense. <br />Mr. Bohlmann said the curbing on Lorain Road is on bad shape; it is broken and cracked. Brick <br />pavers will be installed to meet this curb. The east apron has a standing water problem and the <br />apron is cracked and broken. The trench drains in front of each apron are blocked. Most of the <br />asphalt is in good shape; however at the east entrance the asphalt is wavy and broken, and is not <br />draining properly. There are also several cracked sidewalk blocks. Mr. Bohlmann asked if <br />these repairs will be made and if there are any plans to change the site lighting. Mr. Kollab said <br />those areas have not been inspectecl but he will include all necessary repairs into the project. <br />The existing pole lighting will remain the same. If the budget allows, it is intended to expand <br />the project and apply for the replacement of the canopy with T-shaped style and to replace the <br />pumps and the concrete in that area. Additional lighting may be added at that time. <br />Ms.1Vleredith inquired, if the budget allows, what their schedule is for the additional work; <br />before or after opening for business. Mr. Kollab said it is intended to complete all the work at <br />one time before opening. Discussion took place regarding the proposed canopy changes and the <br />2
The URL can be used to link to this page
Your browser does not support the video tag.