Laserfiche WebLink
• <br />. "Nb. <br />Arclutectural review board meeting, but if that were the case then he would be very coucerned about <br />that type of suggestion. Mr. Konold indicated that he agreed with the Law Director. Mr. Bayus asked <br />if seeiug a picture of a store that was built in December of 1997, and has the sign installed on theu store <br />front would help them get a better idea of what it will look like. Mr. Gomersall questioned why the <br />sign in the picture looked different from the layout that was submitted to the board. Mr. Conway <br />suggested they moved things to meet our criteria. Mr. Kremzar asked if the logo in the picture was <br />going to be Jo Ann's trademark. The board members iudicated that they liked tlie look of the sign in <br />the picture better then what was submitted to them. Mr. Conway suggested if that is the directiou of <br />the board theu the applicant may go back to the original as the inteut was to follow the suggestions of <br />the Arclutectural review board. The board members would like to see the original Jo Ann Fabric sign <br />package that was submitted be used. No further question were asked. <br />T..Maloney moved to graut Jo Ann Fabrics; 26337 Great Northern Shopping Ceuter, their request for <br />variance (1123.12). 1). A 2 foot 11 iuch variance for height of sigu. Proposed sign will be 6' feet <br />11" inches iu height and code permits only 4' feet. A Violatiou of Ord. 90-125, Sectiou 1163.12 (a). <br />2). A 110' square foot variauce for over all sign. I'roposing 185' sq ft A,nd code permits only <br />75. Sq ft Violation of Ord. 90-125, Sectiou 1163.12 (a). In regards to Issues (3). and (4) the board <br />found the oiiginal colors and sign design more to their liking and once approved the law Director said <br />it would be a moot issue. The motiou was second by J. ICremzar, and unauimously approved. <br />Variance Grantecl. During the framing of the motiou it was noted that the variance request may <br />chauge due to the fact the added verbiage would be placed undemeath the Jo Auu Fabric sigu. The <br />building commissioner agreed to provide the clerk with the corrected variance request, and the <br />motiou was corrected accordiugly. <br />12. Star Bauk; 4700 Great Northern Blvd.: <br />Request for variance (1123.12). Request a variance of 32. Sq ft For total sign face area, for a business <br />building. They are proposing 279. Sq ft code permits only 265. Sq ft Violation of Ord. 90-125, <br />Section 1163.11 (c). Note: Board of zoning appeals granted a bu.ilding sign variances on 28 Feb., <br />1996, and 7 May, 1998. <br />Chaumau Gomersall called all interested parties before the board. The oath was admiuistered to Mr. <br />Doerr, with Ellet sign company. Mr. Gomersall reviewed the variances being requested and asked Mr. <br />Doerr if tlus is the saine building that Criant Eagle is moving into, and will they be the main tenants. Mr. <br />Doerr indicated Mr. Gomersall's statement was correct. Mr. Gomersall suggested if we grant you a <br />sign that is over code then it will make your sing bigger then their sign. It is like putting the cart before <br />the horse. Giant Eagle should submit their package first to have their sign size established as they are <br />the main tenants. That is why the current sign is the size it is now. Rini Rego didn't want to give up <br />any more square footage then what they did. It really makes it almost impossible to make a ruling on <br />tlus before we know what Criant Eagles intentions are. Mr. Doerr suggested he could only address <br />what he has heard in tlie media as they did not do Rini Rego nor are they doing any signs for C'riant <br />Eagle. What we have heard is that they are going to keep the Rini Rego name and only change the logo <br />in the middle of their signage. Mr. Konold suggested that Mr. Doerr was conect as he was familiar <br />with the case, but indicated that the final decision would not be made until the 16 Th. of the month. <br />Mr. Gomersall indicated he strongly felt that the board could not make a ruling on the sign without <br />making it contingent upon Giant Eagle. Mr. Koberna asked if Star Bank was in the building now or <br />what was the date they would be in the building. Mr. Doerr suggested they hope to open on October <br />the 9th. VVe have a letter from Giant Eagle pertaining to the sign we are requesting, if you would like <br />to read it. It covers their feelings regarding the sign Star Bank is proposing. Mr. Gomersall indicated <br />8