Laserfiche WebLink
<br />suggested he thought the architects would agree to the parapets on either side, but was not <br />sure they would decrease the width by a third. Mrs. Schulz indicated that the tenants are not <br />in a strip center where you need to fight to be seen. Mr. Liggett suggested showing what the <br />site would look like with the new addition so the board could see how it would balance the <br />new facade. Mr. Blair indicated that he had a plan that would show an addition at the office, <br />but felt the Planning Commission may view that plan as a submittal for an addition. NIr. Elbin <br />suggested that they were trying to get the current tenant in the building in a timely manor. <br />Mr. Yager questioned what type of time frame they were working with. Mr. Blair suggested <br />they would like to open in February. They would like to start construction on the building in <br />November. Mr. Yager indicated that the Architectural Review Board met monthly and the <br />proposal should be tabled. There are esthetic issues that need to be addressed such as <br />proportion of pilaster to capping, proportion of glass to E.F.I.S. system, what the E.F.I.S. <br />system color is, you say cream, but we need to know the name of the color. Mr. Yager <br />questioned Mr. Rymarczyk if the applicants could start work on the inside of the building even <br />if the front facade was being tabled. Mr. Rymarczyk indicated that they could do interior <br />work only. NIr. Blair suggested the Architectural Review Boards suggestions help allot. Mr. <br />Xager suggested address the mechanical units, landscaping, facade to canopy height <br />something other then efface up to the canopy height, as the weather does a number on efface. <br />Just use a masonry type material that is the same color as the E.F.I.S. Mr. Elbin questioned if <br />they would go to the Planning Commission board next week. Mr. Yager suggested that <br />would be up to their chairman as to if they would want you tabled until you return here. It <br />really wouldn't hurt to wait a month as you could start your mechanical work now and the <br />facade is usually done later anyway. <br />M. Yager tabled Developers Diversified (Babies "R" Us) of 26520 Lorain Avenue their <br />proposal, which consists of renovating the exterior building of the former Best Products <br />building. Addressing the following issues; The landscaping plan should coordinate with the <br />building layout and design. The facade should be reviewed for proportions subtracting plus or <br />minus a 1/3 offthe facade. The brick area and mecharucaY units should be hidden with a fascia <br />material. The base should a CMU material. <br />VI. ADJOURNMENT: <br />Acting Chairman Yager motioned to excuse the absence of Chairman Zergott and adjourn the <br />meeting. The motion was seconded by T. Allan and unanimously approved. 1Vleeting <br />adjourned at 7:00pm. <br />. <br />Mark Yager <br />of Commis"sions, Donna Rote <br />4