My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/23/2003 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2003
>
2003 Planning Commission
>
12/23/2003 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 12:49:29 PM
Creation date
1/28/2019 8:04:03 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2003
Board Name
Planning Commission
Document Name
Minutes
Date
12/23/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF NORTH OLMSTED <br />."TOGETHER WE CAN MAKE A DIFFERENCE!" <br />PLANNING COMMISSION <br />MINUTES - DECEMBER 23, 2003 <br />IN COUNCIL CHAMBER5 <br />7:30 P.M. <br />ROLL CALL: Chairman Koeth called the meeting to order at 8:05 p.m. <br />PRESENT: R. Koeth, M. Yager, J. Lasko, W. Spalding, and C. Allan <br />ALSO PRESENT: Planning Director K. Wenger, Assistant Law Director B. O'Malley, Assistant Building <br />Commissioner T. Rymarczyk, City Engineer G. Durbin, and Assistant Clerk of Commissions A. Kilbane <br />ABSENT: T. Hreha, and S. Hoff-Smith <br />II. REVIEW AND CORRECTION OF MINTJTES: <br />The Planning Commission minutes dated November 25, 2003 have been submitted for approval. <br />Chairman Koeth announced that the minutes from the November 25, 2003 meeting have not been fully <br />transcribed and will be addressed at the next meeting. . <br />III. BLTII,DING DEPARTMENT REQUESTS: <br />1. Dunkin Donuts/ Baskin Robbins; PP# 237-09-005 (Clague Road (WRD 2) <br />Proposal consists of construction of a new Dunkin Donuts/ Baskin Robbins Reta.il building. Note: The Architectural <br />Review Board addressed the proposal on 11-19-03 and 12-17-03. Planning Commission tabled proposal 11-25-03. <br />THIS PROPOSAL HAS BEEN WITHDRAWN FROM THE AGENDA AT THE REQUEST OF THE <br />PLANNING DIRECTOR. THE PROPOSAL WILL RETURN TO THE PLANNING COMMISSION ON <br />JANUARY 13, 2004 <br />? 2. Ganley Westside VW; 25600 Lorain Road: (WRD 1) <br />Proposal consists of the construction of a third building, which will be 34,200 square feet and house Ganley <br />Westside VW. Note: The Architectural Review Board addressed the proposal on 11-19-03 and 12-17-03. Planning <br />Commission tabled the proposal 11-25-03. <br />THIS PROPOSAL HAS BEEN WITHDRAW FROM THE AGENDA AT THE REQUEST OF THE <br />APPLICANT. THE PROPOSAL WILL RETURN TO THE PLANNING COMMISSION ON JANUARY 13, <br />2004. <br />3. Sprintcom, Inc.;27351 Butternut Ridge Road; (WRD3) <br />Proposal consists of the construction of a telecommunications monopole at the southwest area of the North <br />Olmsted football field, which will include the reinstallation of the existing lights. <br />Note: The Architectural Review Board addressed this at its meeting on 12-17-03. <br />Mr. Lasko said for purposes of the record, as a member-elect of the North Olmsted School Board he will <br />have to excuse himself from any consideration of this matter, after consultation with the Assistant Law <br />Director. <br />Apnlicant's Presentation <br />Mr. David Richards, an agent for Sprintcom, came forward to address the commission. He explained the <br />proposal is to replace an existing light pole at the southwest corner of the high school football field with a <br />120 foot structure that would serve as the carrier for the existing light array that is currently at the field. It <br />would house the Sprintcom antenna array at the 120 foot level. At the base of the structure would be <br />Sprint's power and radio frequency equipment in a compound that would be surrounded by an 8 foot fence <br />and evergreen landscaping. Access to the site would be accomplished by an asphalt path. There is an <br />existing asphalt path running along the westerly property line that would be widened to accommodate the <br />occasional vehicle traffic down to maintain the site. Maintenance would be roughly once per month when <br />a technician would visit the location, usually at odd hours when no one is present at the site.
The URL can be used to link to this page
Your browser does not support the video tag.