My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/7/2005 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2005
>
2005 Recreation Commission
>
3/7/2005 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 3:09:07 PM
Creation date
1/23/2019 7:53:58 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2005
Board Name
Recreation Commission
Document Name
Minutes
Date
3/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Parks and Recreation Commission Meeting <br />March 7, 2005 <br /> <br /> <br />hole right now with a lot of water sitting under it, and when the maintenance crew drains it, the <br />water seeps up through the cracks and the pool cannot be painted properly. It’s nothing that <br />can’t be fixed, but it needs to be. These are things that are not in our normal budget to take care <br />of on an annual basis. <br /> <br />Mr. Miller asked Mr. Stein to elaborate on the quality of the lines under the ice and the <br />compressors. Mr. Stein said that the parts are still being replaced. The parts are still being made. <br />It’s not a bad system; there is more modern, more energy efficient. The lines are one-inch tubing <br />every four inches on center. The steel header goes out the center with about 300 little one inch <br />pipes sticking out – those are all steel – and at the ends they are called U-Bends. Every U-Bend <br />and the steel header is a mass of rust. Mr. Stein is afraid to melt down just to allow the period of <br />three months of oxygen down there to continue more rust. He thought that by staying in a frozen <br />state the oxidation doesn’t happen. When those break, there is a problem. The entire rink must <br />be drained. Thirty years old – steel sitting in the dirt – Mr. Stein could not say when they are <br />going to break. If you step on it wrong, it’s broken. How thick can a one-inch pipe be? It’s just <br />a matter of time. When it goes, there must be a major renovation. Mr. Miller asked what the ball <br />park estimate would be to complete a major renovation correctly. Mr. Stein said it would be <br />anywhere between $300,000 to $600,000 for a new rink system – concrete with equipment – but <br />this was priced a few years ago. <br /> <br />It was observed by the school board that there has been so much talk and so many plans and so <br />much debate that nothing gets done. Things should be done in a timely fashion and people will <br />support progress. If nothing is done, the citizens will be very hesitant to support anything. That’s <br />why it was important for the Board to renovate the outdoor track last summer, where there hasn’t <br />been a whole meet in seven years. People just talk it to death and nothing gets done. It wasn’t <br />that hard; it was just a matter of sitting down and delegating things to be done. That’s just a <br />small project, but it was a show of good faith to people who want to believe in us and want to see <br />things get done and want to support it. Whatever we decide to do, it should be done right. <br />Renovation does not mean first class, and North Olmsted understands that we own property that <br />can be made to meet today’s needs. When you talk about a rink that’s efficient, that is what <br />should be done. Again, the school district should be a part of this. If not, the schools will lose <br />the rink and the pool. General conversation about the maintenance issues that would cost so <br />much that the schools and the Rec Center should take it to a bigger plan than just fixing the <br />matter. It was agreed that, as Mr. Jesse said, it might be a 30% increase for double the impact. <br /> <br />Mr. Jesse said that right now the Rec Center has more needs than plans as far as the actual <br />numbers. What you see here is what Tom Stein put together ten years ago. It’s a beautiful, <br />practical plan, but it’s between $5 and $10 million. It expands what is already here. His <br />concern, before going to the voters with a major capital improvement plan for the city’s facilities <br />is that we must look at the matter and ask if that is really what people want. There may be a $5 <br />or $10 million facility that no one utilizes. It’s very important to get a survey out to the people, <br />as the schools have done, which the Rec may hopefully utilize. The Rec can expand upon that <br />Page 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.