My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/9/2023 Minutes
Document-Host
>
City North Olmsted
>
Boards and Commissions
>
2023
>
Planning and Design Commission
>
11/9/2023 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 9:45:52 AM
Creation date
4/10/2024 9:45:31 AM
Metadata
Fields
Template:
N Olmsted Boards & Commissions
Year
2023
Board Name
Planning & Design Commission
Document Name
Minutes
Date
11/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
improved pedestrian and bike facilitates, aligning the street with community character. and <br />prioritizing changes around Dover Center and the mall area. The steering committee. composed <br />of regional partners positioned the project in a broader context. Analysis revealed limited <br />crosswalks along the 6.15 -mile corridor, particularly near connecting residential neighborhoods. <br />raining concerns about pedestrian safety and the need for addressing such issues in the ongoing <br />work. <br />Ms. Lyon -Stadler explained that WSP partnered with City Architecture to ensure a holistic <br />approach to urban design and traffic planning. Using available traffic data, including streetlight <br />data. the team identified high-volume signalized intersections and analyzed crash data. Most <br />crashes occurred at non -intersection locations, emphasizing the need for better organization and <br />addressing access management. Bicycle and pedestrian crashes, concentrated between Dover <br />Center Road and Oak Park Road, were more than double the state average, underscoring the <br />urgent need for safer infrastructure in those areas. Transit analysis revealed 78 stops. with _25% <br />havin�o shelters. Considering every transit rider as a pedestrian. attention was -iyen to facilitating <br />safe street crossings. Lorain was identified as a priority corridor for Bus Rapid Transit (BRT) <br />service. aligning with the county planning initiative to prioritize transit movement alone Lorain <br />between downtown and the county limits. potentially unlocking additional funding opportunities <br />for comprehensive improvements. <br />Ms. Bandy-Zalatoris explained that understanding corridor details led to identifying <br />opportunities, considering general improvements, transit. BRT support. greening with street <br />trees. and enhancino corridor character. The plan delves into these ideas with recommendations. <br />examining physical layout and exploring a multi -use path on one side for bikes and pedestrians. <br />A unique opportunity arises with metropark borders. allowing for a community connector linking <br />civic. educational. and regional assets. The plan aims to create safe off-road options and connect <br />to broader regional systems. Corridor -,vide initiatives aimed to transform the corridor's <br />character, prioritizing pedestrians and bicyclists. Focused efforts identified key locations for <br />safety improvements, catalytic investments. and uateway intersections like Clague Road and <br />Stearns Road. The Columbia Road intersection, recognized as particularly dangerous. garnered <br />attention for safety enhancements. especially due to its proximity to the new elementary school <br />site. Other focal points included opportunities for a civic center. leveraging community input. <br />and repositioning aging commercial spaces for potential town center development. An example <br />from the plan is the Columbia Road intersection, emphasizing realistic yet visionary <br />recommendations for immediate and lone -term change. For Columba. reconfiguring the <br />intersection to a 90 -degree angle addresses issues like increased driver speeds. complex walkin�gy <br />paths. and decreased visibilM. The plan tied these visionary actions to engineering rationale. <br />ensuring they align with traffic engineering and safety standards. The approach aimed to brine <br />about immediate improvements while contributing to the corridor's long-term potential. <br />The final phase focuses on implementation. offering prioritized actions for the overall corridor <br />and specific nodes categorized as immediate. near-term. and lona-term. The provided design <br />guidelines address rethinking spaces along the Lorain Corridor. emphasizing flexibility and <br />private property owner incentives. Zoning considerations and a comprehensive list of <br />infrastructure funding options. with eligibility details and local match information. are included. <br />The regional Lorain corridor committee strengthens the city's position for pursuing federal <br />
The URL can be used to link to this page
Your browser does not support the video tag.