Laserfiche WebLink
F' <br />Determination of the Long Term Feasibility of <br />Transporting Unstabilized North Olmsted Biosolids to the North Royalton <br />Composting Facility <br />and <br />Composting the transported biosolids with Unstabilized North Royalton Biosolids <br />Pilot Test Plan of Study Revision No. 1 <br />Task Activity <br />3 -1 Prepare the Draft Pilot Testing Report <br />3 -2 Submit the Draft Pilot Testing Report to the administrative, legislative <br />and legal officials of both municipalities for review and comment <br />3 -3 If economically and technically feasible to begin a long -term program, <br />prepare the Final Pilot Testing Report <br />3 -4 If economically and technically feasible to begin a long -term program, <br />submit the Final Pilot Testing Report to the Ohio EPA - Northeast District <br />Office for review and comment <br />3 -5 If economically and technically feasible to begin a long -term program, <br />prepare Sludge Management Plan amendments, if necessary, after Ohio <br />EPA concurrence <br />3 -6 If economically and technically feasible to begin a long -term program, <br />prepare the legal documents needed by both municipalities to begin the <br />long -term program recommended in the Final Pilot Testing Report <br />3 -7 If economically and technically feasible to begin a long -term program <br />and after Ohio EPA concurrence with the amended sludge <br />management plans, finalize the legal documents needed by both <br />municipalities to begin the long -term program recommended in the Final <br />Pilot Testing Report <br />3 -8 After finalization of the legal documents needed by both municipalities <br />to begin the long -term program recommended in the Final Pilot <br />Testing Report, begin the long -term program <br />The Plan of Study activities have not been assigned a specified "time(s) of <br />completion " due to the interactive nature of the activities. The sequence of the Plan of <br />Study activities, therefore, would be the crucial part of the pilot testing and not having <br />each pilot testing activity completed on a specified date. Therefore, the quality of the <br />pilot testing will be of the highest level attainable and the reporting documents will be <br />similarly of the highest level attainable. <br />+ + END OF PLAN OF STUDY + + <br />CompostPOS -Rev l.doc Page 6 of 6 September 6, 2001 <br />