My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-122 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2007
>
2007-122 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 3:51:23 PM
Creation date
12/19/2013 3:58:56 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2007-122
Legislation Date
10/16/2007
Year
2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4. That the COUNTY will review the construction plans for conformance with section B-2 of <br />this Agreement. County approval of plans and specifications is required prior to the award <br />of the construction contract. The COIINTY will make an inspection of the completed <br />project. <br />5. That the MUNICIPALLITY shall agree to provide the COiJNTY with a complete set of <br />as-built plans upon the completion of the project. <br />C. FUNDING <br />1. That the MUNICIPALITY hereby agrees to participate with the COUNTY in the cost of <br />the improvement by an allocation from the County Motor Vehicle License Taac Fund to pay <br />the COUNTY portion of the project. <br />2. That if the project is financed with State or Federal-aid funds, eligible costs of the <br />improvement shall be financed from the aforesaid funds. <br />3. T'hat if funds administered by the Oluo Public Works Commission are used for this project, <br />the amount of such funds will be deducted from designated project costs prior to the <br />application of the participatory percentages specified in this Agreement. <br />4. That the COUNTY sha11 contribute ten percent (10%) of the non-Issue 1 share of the cost <br />of construction which is determined to be eligible by the Cuyahoga County Engineer's <br />policies up to a maximum of $ 260,000.00. The anticipated construction cost for this <br />project is $ 2,600,000.00. To determine funding eligibility, the COLJNTY shall be norified <br />immediately of any significant changes to the scope of work and/or construction cost. <br />Within the corporate limits of the MUNICIPALITY, the MtJNICIPALITY shall contribute <br />ten percent (10%) of the non-Issue 1 share of the cost of construction determined to be <br />eligible by the Cuyahoga County Engineer's policies and one hundred percent (100%) of <br />the cost of construction supervision, engineering, right-of-way, contract administration, and <br />construction determined not eligible by the Cuyahoga County Engineer's policies. Any <br />terms appearing elsewhere in this Agreement which vary from those set forth in this <br />paragraph shall take precedence. <br />D. MAINTENANCE <br />That upon completion of said improvement, said MUNICIPALIT'Y will thereafter keep said <br />highway open to traffic at all times; and <br />1. Maintain the improvement in accordance with the provisions of the statutes relating thereto <br />and make ample financial provisions for such maintenance; and <br />2. Maintain the right-of-way and keep it free of obstructions in a manner satisfactory to the <br />COUNTY and hold said right-of-way inviolate for public highway purposes and permit no <br />signs, posters, billboazds, roadside stands or other private installations within the ri,ght-of- <br />way limits; and <br />-2- <br />? ???-?., ,-,.. ?t ,. .- -11 ?. ,,,
The URL can be used to link to this page
Your browser does not support the video tag.