Laserfiche WebLink
This agreement may cover the following checklist for start-up and check of the heafing and <br />air conditioning equipment: <br />1- Check refigerant charge. <br />2- Check for refrigerant leaks. <br />3- Check condensers and dean when needed. <br />4- Check condenser fan blades. <br />5- Check and tighten ail electricai connections. <br />6- Check running amps and volts. <br />7- Check condensate drains, pans and lines for bloclcage. <br />8- Check blower belts for condition, tension and alignment. <br />9- Check and lubricate all bearings. <br />10 - Check blowers for cleanliness. <br />11- Check sight glass moisture indicatar. <br />12 - Inspect all safety controls for proper operation. <br />13 - Check cooling and heating change-over controls. <br />14 - Inspect contactor contacts. <br />15 - Check, lubricat+e and adjust fresn air dampers. <br />16 - Inspect evaporator cals. <br />17 - Check compressor oil levels where possible. <br />18 - Inspect starting and running controls. <br />19 - Check for vibration and noise. <br />20 - Inspect afl relays. <br />21- Gean and adjust bumers. <br />22 - Inspect flue piping. <br />23 - qean and adjust pilots. <br />24 - Clean and adjust all ccntrcls. <br />25 - Inspect heat exchangers. <br />25 - Check overall operation. <br />27 - Brush indoor coils where needed. <br />