My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-161 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2004
>
2004-161 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 3:57:39 PM
Creation date
12/16/2013 6:59:04 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2004-161
Legislation Date
10/19/2004
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
?p • / <br />? , , ? ?• Ft-f ?' >` T <br />Illc?xrnnat?g <br />4295 East 146 Srree? <br />aFn,frOW C,,pa.,y, Cleveland, Ohio 44128 <br />September 17, 2004 <br />North Olrnsted Waste Water Treatment Facilitv <br />23775 Mastick Road <br />North Olznst.ed, Ohio 441070 <br />Attention: Robert H. Nichols, Superintendent <br />Dear Robert, <br />Subject: Waste Water Treatment Plant transformer replacement <br />The Electrical Services Group is pieased to provide quotation of $19,894.00, plus applicabie <br />taxes and perrnit fees, for the repla.cement of the existing 13.2/277-480V, 750 kVA <br />transformer. The new transformer specification includes: Copper windings, dead front-loop <br />feed constructian, 2 taps 2.5% above and below, c{rain valve with sampler, oil level gauge, dial <br />thermometer, and a pressure vacuum gauge. The following materials and services are included <br />in this quote: <br />•Removal of the existing 750 kVA transformer. <br />• Installation of 342, 15 kV spfices. <br />• Installation of 3-42, 15 kV elbows. <br />• Installation af 3-15 kV eIbow arrestors. <br />This quote is contingent on the City's approval of the specified equipment and desi2n and is <br />based on straight time labor rates. Work outside normal business hours will be billed at the <br />appropriate overtime rate. <br />The quote is based on a visual inspection and known site conditions. Unforeseen conditions. <br />including collapsed or unusable ducts, requiring additional eYCavation or boring will be billed <br />as an adder. All sgoils removed during excavation are to remain on site and are the <br />responsibility ofthe awner. _ <br />Disposal of the existina transformer is available at an additional cost of $11>750.Q0 if the <br />tr=former oil test at less than 100 parts per million (ppm) PCB. An uil test equal to or ??-eater <br />than 100 parts per million (ppm) PCB will result in an additional disposal fee of $500.00.
The URL can be used to link to this page
Your browser does not support the video tag.