<br />F4ARRING`3'ON ELECi'RiC Cf?. <br />CONDITIONS OF PROPOSAL <br />Acceptance of this proposaf Uy contractor sliall be acceptance of all tenns and conditions recited tierein which shali supersede any conf]icting terni in any other <br />contrac[ documeiit. Any of the Contractor's terms and condicions in additiotl or different from this proposal are objected to and shall have no effeet. Contraotor's <br />agreement herewith sliall be evidenced by Coatractor's signature hereon or by permitting Subcontractor to commence wozk for project. <br />I. Subcontractor sliall be paid monthly progress payments on or 6efore the 1 Stlt of apch month for the value of work completed plus the amount of materials and <br />equipment siutably stored on or aff site. Final payment shall be due 30 days after the worl< described in the Proposal is substantially completed. No provision <br />of this agreement sliall serve to void the Subcontracior`s entitlement to payrnent for properly perfornied worl< or suitably stored niaterials or to require tiie <br />Subcontractor to continue performance if timely payments are not made to SuUcontractor for suitably perfomied woric ar stored materials or to void <br />Subcontractor's right to f le a(ien or claim on its behalf in the event that any payment to Subcontractor is not timely made. <br />2. The Contractor wi11 withhold no more retention from the Subeontractor than is being wichheid by the Owner fi•om the Contractor with respect to the <br />Subcontractor's work. <br />3. All sLims not paid when du.e shal( bear an inCerest of 1-1/2% per month or the maximum legal rate permitted by 1aw, whichever is less; and all costs of <br />collection, inciuding a reasonaUle aYtorney's fee, sliall be paid by che Contraetoc <br />4. No Uackcharges or claim of the Contractor for services shall be vafid except by an agreemant in writing by the Subcontractor before tile wod< is executed, <br />excepT in tiie case of the Subcontractor's failure Co meet any requirement of the subcontract agreement. In sucli evenY, the Contrlctor sliall notiFy the <br />Subcontracfor of sucli default, in writing, and allow the SuUcontractor reasonaUle time to correct any deficiency before inourring any cost chargeaU]e to tiie <br />Subcontractor, <br />5. Contractor is to prepare all worl< areas so as to be acceptable for Subcontractor to work under the suUcontract. Subco»tractor wi(i not be cal'!ed up To start <br />worl< until sufficient areas are ready to insure continued work. The Coneractor shaR furnish al1 temporary site facilities including suitable storage space, <br />hoisting, temporary eiectricaf and water at no cost to Subcontractor. <br />6. Subcoiitractor sliall be oiven a reasonable time in which to make delivery of materials and/or 1aUor to commence and comp)e[e performance of the contract. <br />Subcontractor shall not be responsible for delays or defaults where occasioned by any causes of any kind and extend beyond its controi, including but not <br />limited to; delays caused by the owner, general contractor, architect andlor engineers, delays in transportation, shortage of raw materiaJs, civil disnrders, labor <br />diffculties, vendor allocations> fires, floods, accidents and acts of God, Subcontractor sha11 be entitled to equai a.djustment in Yhe subcontract amount for <br />additional eosts due to unanticipated project delays or accelerations caused by others wllose aCYs are not tiie Subcontractor's responsiUiiity atld to time <br />exCensions for unavoidable delays. The Contractor sliall make no demand for liquida.ced damages for delays in excess of the amounc specified in Uhe <br />subcontract agreement and no tiquidated damages may be assessed against Subcontractor for more Chan the amount paid by dhe Contractor for unexcused <br />dalays to the extent actuaily caused by SaUcontractor. <br />7. The SuUcontracFor's equipment and work are guaranteed for a period of one year from the daCe of substantial comptetion or use by the Contractor or the <br />Contractor's cLastomer, whiciiever is earlier. THIS WARRANTY IS IN LIEti OP ALL OTHER WARRANTISS, EXPRESSED,OR 1MPLIED, [NCLUDING <br />ANY WARRANTIES OR NIERCHANTABILITY dR FITiVESS FOR A PARTICULAR PURPQSE. The exclusive reinedy shall be that Subcontractor wii] <br />repiacc or repair any part of its worl< which is found to lae defeetive. Subcontractor shal] not be responsible for damage or dePect caused Uy abuse, <br />modifications not executed by the 3ubcontractor, improper or insufficient mainYenance, improper operation or norma] wear, tear and usage. <br />9. Wod< called for herein is to be perfarmed during Subcontractor's regular hours. All work performed outside of such hours shall be charged for at ratcs o; <br />amoimts agreed upon by the parties at the Yime overtime is authorized. <br />9. Contractor sha]!, if the Owner does not, purchase and mair,tain all risk insurance upon fuif vahie of the entire wori< and/or materials delivered to the ioLsite, <br />whicii sliall include che interest of Subcontractor. <br />1.0. The SubcontracYor sliall indenmify and hold harmless the Contr-actor, Owner, Architect and otllers from damages oniy to the extent such damages were caused <br />by any neglioent act or omission af the Subcontractor or anyone for whose acts the Subcontractor is 3iable. <br />11. The subcontraet form used between the Subcontractor and tiie Conh•actor will be AIA 5tandard Forni Subcontract Documeiit A401. Where there is z conl7ict <br />between provisions o(either the AIA Standard Fonn or the contrack documen[s Uetween the Owner and Contractor and this Proposal, then tius Proposal sliall <br />0o vern. <br />12. Specified documents and/or fonns referenced in the contract are accepted only if tiley are included in the bidding documents. <br />Date: Subcontractor: <br />Contractor: HARRINGTON ELECTRIC C0. <br />By: By: <br />Title: Thomas A. Morgau, P.E. <br />President