Laserfiche WebLink
APPENDIX B <br />PUMP STATIONS INFLUENT CONTROL GATES PROJECT <br />Scope of Services <br />A. Intent of the Design Professional Services: The City has prepared this RFP with <br />the intention of retaining the services of a design professional firm to: <br />1. Prepare one set of updated Dover Pump Station drawings based on the 1965 <br />record drawings and that includes the Work shown in the 1995 Emergency <br />Generator Set Project drawings and the 1998 Wet Well Enclosure Project <br />drawings; <br />2. Prepare one set of updated Lebern Pump Station drawings based on the 1961 <br />record drawings and that includes the Work shown in the 1978 Emergency <br />Generator Set Project drawings, the 1991 Discharge Piping Improvements <br />Project drawings and the 1999 Electrical Distribution Improvements <br />schematics; <br />3. Design of a manually operated, downward closing gate to be mounted over the <br />21-inch diameter influent sewer in the Dover Pump Station wet well as well as <br />the gate stem, stem guides, ma.nual operator and manual operator support <br />beams; and <br />4. Design of a manually operated, downward closing gate to be mounted over the <br />18-inch diameter influent sewer in the Lebern Pump Station wet well as well as <br />the gate stem, stem guides, manual operator and ma.nual operator support <br />beams. <br />B. Basic Scope of the Design Professional Services: In providing the Scope of <br />Services, the design professional firm will place special emphasis on: <br />1. Demonstrated ability to convert existing record drawings to electronic drawings <br />using a version of AutoCADO compatible with the Version 12 software owned <br />by the City; <br />2. Demonstrated ability to modify existing sanitary sewers and wet well structures <br />- in order to allow for the mounting of downward closing gates; and <br />3. Demonstrated ability to meet project schedules. <br />C. Specific Scope of the Design Phase Services: Tn providing the Scope of Services, <br />the design prafessional fum shall include the following specific duties: <br />1. Prepare a set of updated Dover Pump Station drawings.