My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-062 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2002
>
2002-062 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:03:08 PM
Creation date
12/30/2013 9:16:36 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2002-062
Legislation Date
5/8/2002
Year
2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
() Retain at the Geotechnical Engineer's office, and remain open to inspection: <br />() until the end of the Bidding or Negotiation Phase. <br />OR <br />() until foundation installation is complete. <br />( ) Other: <br />(SpecifY) <br />ARTICLE 6 <br />FOUNDATION ENGINEERING EVALUATION AND RECOMMENDATIONS <br />6.1 The Geotechnical Engineer shall analyze the information developed by investigation or otherwise available to the Geotechnical <br />Engineer, including those aspects of the subsurface conditions which may affect design and construction of proposed structures, and <br />shall consult with the Architect on the design and engineering requiremenis of ihe Project. Based on such analysis and consultation, the <br />Geotechnical Engineer shall submit a professional evaluation and recommendations for the necessary areas of consideration including, <br />but not limited to, the items checked below: <br />( X) 6.1.1 Foundation suppori of the structure and slabs, including bearing pressures, bearing elevations, foundation design <br />recommendations and anticipated settlement. <br />( X) 6.1.2 Anticipation of, and management of, groundwater for design of structures and pavements. <br />( X) 6.1.3 Lateral earih pressures for design of walls below grade, including bac:kfill, compaction and subdrainage, and iheir <br />requirements. <br />( X) 6.1.4 Soil material and compaction requirements for site fill, construction backfill, and for the support of structures and <br />pavements. <br />( X) 6.1.5 Subgrade modules for design oFpavements or slabs. <br />O 6.1.6 Temporary excavation and temporary protection, such as excavation sheeting> underpinning and temporary <br />dewatering systems. <br />( ) 6.1.7 Stability of slopes. <br />( ) 6.1.8 Seismic activity. <br />() 6.1.9 Frost penetration depth and effect. <br />(} 6.1.10 Analysis of the effect of weather or construction equipment or both on soil during construction. <br />(x-) 6.1.11 Analysis of soils to ascertain presence of potentially expansive, deieterious, chemicaily active or corrosive materials or <br />conditions, or presence of gas. <br />() 6.1.12 Evaluation of depih of material requiring rock excavation and methods of removal. <br />( ) 6.1.13 Other: <br />(Describe special requirements, such as specification clauses, for the items designated above.) <br />ARTICLE 7 <br />CONSTRUCTION PHASE SERVICES <br />(Herein describe geotechnical serv'ues to be provided during various contractor operations.) <br />1 . . , 20006-5292. <br />REOUEST FOR PROPOSAL - GEOTECHNICAL SERVICES - 1993 EDITION - AIAaD - WARNING: Unlicensed photocopying violates U.S. copyright laws and <br />will subject the violator to legal prosecution. ihis document was electronically produced with permission of the AIA and can be reproduced in <br />accordance with your license without violation until the date of expiration as noted below. expiration as noted below. User pocument: g602 <br />geotechnical rfp.aia -- 4/26/2002. A!A License Number 1004232, which expires on 12/3112002, <br />Electronic Format G602-1993 <br />6
The URL can be used to link to this page
Your browser does not support the video tag.