Laserfiche WebLink
"Y <br />WHEREAS, through the RFP (Request for Proposal) process, the CTTY has determined <br />that CONTR.ACTOR is the fum most qualified to provide the City with the GEOTECHNICAL <br />SERVICES needed for the PROJECT at a price which is fair and reasona.ble to the CITY; <br />NOW THEREFORE, the CITY and CONTRACTOR, each acknowledging the sufficiency <br />of the consideration contained in the terms and conditions of the Agreement, agree as follows: <br />SECTION 1. BASIC SERVICES. <br />1.1 The services to be performed by CONTRACTOR under this Agreement sha11 be <br />the GEOTECHr1ICAL 5ERVICES required for the PROJECT. <br />1.2 T'he scope and details of the services are more fully described in Exhibit I and <br />Exhibit IV, Scope of Services, attached hereto and made a part hereof. <br />SECTION 2. ADDITIONAL SERVICES. <br />2.1 No additional services are expected to be required by CONTRACTOR for the <br />PROJECT. However, sho2,ild the providing of any additional services become necessary, any such <br />additional required services will be separate from the Section 1- Basic Services, and will be <br />considered an Optiona.l Service that may be undertaken only upon written autharization by the <br />CITY. <br />SECTION 3. CITY'S RESPONSIBILITIES. <br />3.1 The CITY shali do the following in a timely manner: <br />3.1.1 Designate a CITY representative having the authority to give to <br />CONTRACTOR instructions, recezve information, define the CITY'S policies <br />and make decisions with respect to the PROJECT. <br />3.1.2 Provide a11 criteria and information needed by CONTRACTOR regarding the <br />CITY'S requirements for the PROJECT, including design objectives and <br />constraints, space and capacity requirements and budgetary limitations. <br />3.1.3 Furnish to CONTRACTOR, as needed, copies of all design and construction <br />standazds, which the CITY requires for the PROJECT. <br />2