My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-108 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2000
>
2000-108 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:10:46 PM
Creation date
12/30/2013 8:11:53 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2000-108
Legislation Date
9/19/2000
Year
2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Company Overview Page 2 <br />? <br />?- ?? <br />specifications and supplemental contract documents. <br />Energy: Energy audit and energy analysis, conservation recommendations and retrofit <br />engineering; evaluating energy management projects utilizing life cycle costing techniques; <br />pre-engineering energy studies; feasibility studies and engineering for energy recovery <br />systems; energy demand projection; and energy resources development (R & D). <br />Sanitury/Environmental: Design and construction management of water and wastewater <br />treatment plants; storm and sanitary sewer collection systems; water mains; Combined Sewer <br />Overflow (CSO) Systems; Sazutary Sewer OverIlow (SSO) Systems; and detention and <br />retention storage facilities. Development and management of Sewer System Evaluation <br />Survey (SSES), environmental studies, environmental impact statements and value <br />engineering. <br />In addition to POLYTECH's extensive background and expertise in a variety of engineering <br />disciplines, our in-house computer capability and quality control program assure clients of an <br />efficient state-of-the-art approach to design and cost control from preliminary concepts through <br />construction supervision. Each pmject is designed to create a total facility, which sets a standard <br />of excellence in design quality while maintaining the most practical balance possible between <br />initial costs and optimum life cycle values. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.