Laserfiche WebLink
s1reYW?Y <br />M'. Ifl2u1 DelCh,tT;`c^n1'',', <br />City of Nortn 01n,.,tpd <br />, <br />Vehrcle L.ift <br />Project Schedule <br />The project will be completed within eight weeks of authorization. <br />Project Fee <br /> <br />Chagrin Valley Engineering, Ltd. Proposes to perform the above services for,the City <br />of North Olmsted for a lump sum fee of $4,860.00. <br />Supplementary Services <br />Supplementary services which entail work over and above the work detailed in the <br />Scope of Services section will be provided at the following hourly rates. <br />Supplementary services shall not be pertormed without the consent of the City. <br />Supplementary services include, but are not limited fo the following. <br />• Additional design services due to a change in the.scope of the project. <br />• Construction staking, inspection or as-built surveys and as-built plan <br />preparation. • Construction Administration. <br />• Attendance at Pre-Construction meeting. <br />• Reviews of shop drawings. <br />The hourly rates for the above services are as follows. <br />Professional Engineer - $70.00/hr <br />Engineer - $62.00/hr <br />Cad Designer $55.00/hr <br />Two Man Survey Crew $100.00/hr <br />Wetland Scientist $75.00/hr <br />Professional Surveyor $62.00lhr <br />We look forward to working with the City to provide the design services for this <br />important project. Should you have any questions regarding this Proposal, please <br />contact me at (440) 439-1999. <br />2 <br />