My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-074 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2000
>
2000-074 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:11:03 PM
Creation date
12/30/2013 8:44:23 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2000-074
Legislation Date
6/20/2000
Year
2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Personnel 5-11 <br />• Managed the preparation of detailed plans and specifications for the installation of approximately <br />7,2251ineal feet of 12-inch sanitary sewer. Included rehabilitation of 3,000 lineal feet of 8-inch <br />sanitazy sewer and completing applications forms and providing assistance to the City to obtain a <br />loan from the EPA's Water Pollution Control Fund to finance the project. <br />• Managed the preparation of plans and specifications for the installation of approximately 3,000 <br />lineal feet of new sanitary sewer to connect a new subdivision into the City of Geneva. Project <br />included obtaining a Norfolk and Southern railroad crossing pernut and assistance to the City to <br />obtain a loan from the EPA's Water Pollution Control Fund to finance the project. <br />• Prepared assessments for the Lakeshore Boulevard Sanitary Sewer and Force Main. Project <br />included attending public meetings to review the assessment method with an equalization board <br />and answer questions from the public. <br />• Involved in preparation of report to Ohio EPA analyzing alternative methods for the composting <br />of municipal sludge at the Greater Mentor Wastewater Treatment Plant. Included cost analyses, <br />recommendations, and coordination with public agencies. <br />? Developed 1-acre site for a sanitary sewer pump station in Perry Township. This project included <br />grading, asphalt drives, landscaping and drainage improvements for the Perry Area Sanitary <br />Sewer in Lake County, Ohio. <br />• Served as project manager and lead designer in the preparation of plans and specifications to <br />eliminate a package wastewater treatment plant with a new pump station and force main in <br />Richmond Heights, Ohio. <br />• Prepared plans and specifications for 3,500 feet of gravity sewer, pump station, and 1,100 feet of <br />force main on Lake Shore Boulevard in Eastlake, Ohio. <br />Stormwater Collection <br />• Prepared detailed plans and specifications to repair the concrete bottom of a box culvert in <br />Cleveland Ohio. <br />• Prepared detailed plans and specifications for approximately 3,2001ineal feet of a 48-inch storm <br />relief sewer in Louisville, Ohio. <br />• Managed the preparation of detailed plans and specifications to replace three old box culverts <br />over Cowles Creek in Geneva, Ohio. Included coordination with public agencies, utilities, and <br />easement acquisition. <br />• Prepared detailed plans and specifications to reconstruct a storm sewer outfall structure for a 48- <br />inch storm sewer discharging to Lake Erie. This project included obtaining an Army Corps of <br />Engineers' permit, bluff erosion analysis, and erosion control mitigative measures. <br />Site Development <br />Project Manager for the site development portion of a bus maintenance facility in Strongsville, <br />Ohio. The site work included parking facilities for 80 school buses and 70 cars. Additional site <br />
The URL can be used to link to this page
Your browser does not support the video tag.