My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
99-143 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1999
>
99-143 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:15:09 PM
Creation date
12/27/2013 3:52:23 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
99-143
Legislation Date
11/16/1999
Year
1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-0 <br />PROFESSIONAL PROFILE - Suriit S. Sandhu, P. E. <br />KEY PROJECTS: Project Manager & Mechanical Engineer for several Case <br />Western Reserve University retrofit projects in the past seven <br />years, including high pressure steam and chilled water <br />distribution in seven buildings, heat reclaim coil loop system for <br />School of Medicine, H.V.A.C. system retrofit of Tomlinson, <br />Rockefeller, Wickenden, Glennan and Millis Science Centers. <br />Steam to hot water system retrofit including central heating <br />system for seven buildings, individual hot water boilers for <br />heating and domestic water in nine dormitory and Fraternity <br />buildings. <br />Project Mechanical Engineer for City of Cleveland, Division of <br />Water, Parma Supervisory Control Center and Engineering <br />Field Services Office. Project scope included complete design <br />of H.V.A.C., Plumbing and Fire Protection for the new and <br />renovated buildings. <br />Project Manager and Mechanical Engineer for Defense <br />Communication Agency, Arlington, Virginia. Project included <br />major renovation and replacement of H.V.A.C. system for the <br />entire four-story building. Total mechanical construction cost <br />of 3.8 million. <br />Project Engineer conducted energy audits and mechanical <br />retrofit design of several buildings for Willoughby, Eastlake City <br />Schools, Hospitals, Cleveland Public Schools, Cuyahoga <br />Community College Western Campus, Cleveland State <br />University, Case Western Reserve University and Baldwin <br />Wallace College. <br />Project Manager and Mechanical Engineer for State of Ohio, <br />University of Toledo, Academic Center. Project scope <br />included complete design of H.V.A.C., plumbing and fire <br />protection and utility tie-in for the new facility. <br />Project Manager and Mechanical Engineer Head Start, E. 84th <br />& Hough Avenue, Cleveland, OH. Design of H.V.A.C., <br />Plumbing and Fire Protection for a new Day Care Center. <br />Project Manager and Mechanical Engineer Southern Hills <br />Rehab Center, Middleburg Heights, OH. Design of H.V.A.C., <br />Plumbing and Fire Protection for a new 60-bed nursing home <br />facility. <br />Page 2 of 2 <br />a9r.. .. r :r?. , . ...? n , .. r <br />T
The URL can be used to link to this page
Your browser does not support the video tag.