My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
99-143 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1999
>
99-143 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2014 4:15:09 PM
Creation date
12/27/2013 3:52:23 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
99-143
Legislation Date
11/16/1999
Year
1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,v?, <br />` SANDHU & ASSOCIATES, INC. <br />eoasu?tn9 ?n9lnccu <br />October 8, 1999 <br />Mr. Paul W. Deichmann, P.E. <br />City Engineer <br />City of North Olmsted <br />5200 Dover Center Road <br />North Olmsted, OH 44070-3129 <br />Re: Proposal for Mechanical Engineering Services <br />Police Station H.V.A.C. System Improvements <br />Dear Mr. Deichmann: <br />We are pleased to submit a proposal for professional engineering services for the referenced <br />project. We visited the building on September 23, 1999 with Sergeant Clute and reviewed the <br />scope of work. <br />A. SCOPE OF WORK: <br />1. Design of replacement of two (2) existing rooftop gas/electric packaged multizone <br />units. <br />2. Design of modifications to the existing ductwork as required by replacement of <br />the rooftop units and temperature controls. <br />B. BASIC SERVICES: <br />Collect existing design drawings and/or as-built drawings, field visit the site as <br />required to collect data and verify location of existing equipment, ductwork, power <br />supply and controls. Update the drawings with actual field conditions. <br />2. S#udy the existing systems serving the renovated areas. Perform design <br />calculations and verify if existing system has enough capacity to serve existing <br />area, with added computerequipment. --------------- - <br />- - 3. Preqare preliminary layout of proposed equipment and ductwork and cost <br />est;mate. Meet and review proposed layout and cost estimate with you and your <br />staff. <br />4. After the approval of your staff, we shall prepare the final working drawing, <br />including demolition plan and specifications for bidding and construction <br />purposes, all in compliance with the latest mechanical codes of the Ohio Basic <br />Building Code. <br />5. We shall verify electrical power requiremEnts and structural weight of new <br />H.V.A.C. units and compare with the existing units. ???????? <br />Page 1 of 3 <br />0 G T 12 1999 <br />NORTH OLMSTED <br />EN <br />26031-A Center Ridge Road Westlake, Ohio 44145 (440) 892-4470 ?ic'?'83?4W7'TPj` <br />
The URL can be used to link to this page
Your browser does not support the video tag.