My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2003
>
2003-097 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2014 3:23:17 PM
Creation date
12/26/2013 7:46:28 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2003-097
Legislation Date
6/17/2003
Year
2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1321.01 General.Building Fees; Contractor Registration <br />The following permit and inspection fee schedule is authorized to be charged and collected by the <br />Building Commissioner, in the amount provided for in each of the following years: <br />(a) Repistration/Licensinq of Contractors <br /> Reference is made to Section 1317.08 <br /> (1) General licensing fee .................................................................................... $150.00 <br /> (2) General ficensing fee renewal (up to 30 days after expiration date) ..........................:. $75.00 <br /> (3) Registration fee .............................................................................................. $100.00 <br /> (4) Registration fee renewal (up to 30 days after expiration date) ................................... $50.00 <br />(b) Residential Buildinps: New Construction <br /> (1) One-family house shall be the higher of the following : <br /> (a) Initial fee plus ........................................................................................:.... $126.00 <br /> For each 100 sq ft of the area of the building, including the uppermost <br /> stories of usable area ............ .............................. ........................ ................ $9.00 <br /> (b) Per $1,000 of #he construction cost .............................................................. 0.003 <br /> (2) Two-family house shall be the higher of the following: <br /> (a) Initial fee plus per dwelling ............................................................................. $126.00 <br /> For each 100 sq ft of the area of the building, including the uppermost <br /> stories of usable area ..................................... ... ........................................... $9.00 <br /> (b) Per $1,000 of the construction cost ................................................................ 0.003 <br /> (3) Apartments houses containing more than two dwelling units <br /> shall be the higher of the following: <br /> (a) Initial fee plus per dwelling ............................................................................ $84.00 <br /> For each 100 sq ft of the area of the building, including the uppermost <br /> stories of usable area ... ... ... ... ..... ... ... ... ......... ... ... ... ... ... ... .. . ... ... ... ... ... ... ... ... ... $9.00 <br /> (b) Per $1,000 of the construction cost ... ........................................ ..................... 0.003 <br />(c) Residential Buildinqs, Additions <br /> (1) initial fee plus the higher of the following .............................................................. $42.00 <br /> (a) Also usable floor area fee per 100 sq ft in all stories .......................................... $5.00 <br /> (b) Per $1,000 of the construction cost ............ ................................................. ... 0.003 <br />(d) Residential BuildinQS - Accessorv Detached Garapes & Accessorv Structures <br /> (1) Initial fee over 200 sq ft ... .................................... ...... ...... ................................. $45.00 <br /> (2) Also per 100 sq ft floor area ...... ... ... ... ....... ........ ... ... .......... ......... ... ...... ... ... ... ... ... $2.00 <br />(e) Residential BuildinQS, Alterations Other Than Additions <br /> (1) Initial Fee ................................................................................................ ...... . $42.00 <br /> (2) Also for each $1,000 evaluation in excess of_first $2,000 ......................................... $5.00 <br />(f) Replacement of Roofin4 and Sidina <br /> (1) Initial Fee ..................................................... ............... .................. ................. $42.00 <br /> (2) Also per 1,000 sq ft. in excess of the first 1000 sq ft ................................................ $5.00 <br />(g) New Drivewavs (Asphalt and Concrete) and Patio (in excess of 100 sa ft). <br /> (1) Initial Fee ...................................................................................................... . $50.00 <br /> (2) Also per 1,000 sq ft. in excess of the first 1000 sq ft ................................................ $5.00 <br />(h) Business or Industrial Buildinca New <br /> Shall be higher of the following: <br /> (1) Initial Fee Plus ............ .................................... ... ... ............ ............ ...... ...... ....... $850.00 <br /> (a) Per 100 square feet of floor area ........................ ................................ ....:...... $10.00 <br /> (2) Per $1,000 of the construction cost ................................................................... 0.003 <br />(i) Business or Industrial Buildinct Aapurtenances Additions and Alterations <br /> (1) Initial Fee, plus the higher of the following: $150.00 <br /> (a) Per 100 square feet of floor area ............... ... ........ ...... ... ........... ... ...... ......... ... $10.00 <br /> (b) Per $1,000 of the construction cost ................................................................ 0.003 <br />(j) Accessorv Sturcture (sheds, caazebo, areehouse. cabana, arbor, etc.) <br /> (1) Not in excess of 200 sq ft .................................................................................. $50.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.