My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-083 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2003
>
2003-083 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2014 3:23:21 PM
Creation date
12/26/2013 8:22:22 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2003-083
Legislation Date
6/3/2003
Year
2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
?. . <br />• ? ? coo <br />24530 SPERRY DRIVE, WESTLAKE, OH 44145 <br />(440) 899-0242 & (440) 942-1030 <br />FAX: (440) 899-1092 <br />* * * PROP OSAL/CONTRACT * * * <br />April 22, 2003 <br />Proposal submitted to:NORTH OLMSTED FIRE STATION #2 Phone:440-777-1214 <br />Address: 29374 LORAIN RD. NORTH OLMSTED OH 44070 Job Location: SAME <br />i. Remove existing roof inembrane down to existing metal deck. <br />2. Inspect existing metal decking far any distortion or rusting. Should any decking need <br />replacing, it witl be replaced at a cost of $4.00 sq. ft. . <br />3. Install (111) one inch I.S.O. insulation board over complete roof area, mechanically fastened. <br />4. Instalt Polyglass S.A. modified base sheet over complete new insulation board. <br />5. Install Polyglass APP modified roof system over complete roof area. <br />6. Flash all new wail de#ails with APP modiried. <br />7. Install term-bar at top edge of all wall flashing using proper anchors. <br />8. Install new drain inserts at all drain locations. <br />9. Install new outside perimeter metal. <br />10. Prime flange of new metal with asphalt primer to insure proper adhestion of new roofing <br />membrane. <br />11. Install APP modified over metal flange. <br />12. Install aluminum coating over complete new roof surface. <br />13. Clean-up and remove ali job related materials upon completion of job. <br />14. Fifteen (15) year limited warranty on labor & material. <br />WE PROPOSE h eby to fu ish material and labor - complete in accordance with above specifications for the <br />sum of: $17 500 00 . •P t be ade as foilows: UPON COMPLETION. <br />This proposal ma be with aw o ap ro by managem nt wit m 15 days. <br />Authorized Signat - Date: '?? <br />ACCEPTANCE OF PROPOSAL - <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the <br />work as specified. Payment will be made as outlined above. <br />Date of Acceptanc :_G??e;?.?.c <br />- - ^^ ? - <br />Signature: -? ^ ? <br />Signature _??? -- <br />All material is guaranteed to be specified. All work to be completed in a workrnanlike manner according to standazd practices. Any <br />alteration or deviation from the above specifications involving extra costs will be executed only upon written orders, aiid will become <br />an exua charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our contra. Owner <br />to carry fire, tornado, and other necessary insurance. Our workers aze fully covered by Workmens' Compensation Insuranee and <br />Liability Insurance. New roof system will conform to the condition of the existing roofing or substructure irregularities. Terms; <br />Payment due upon completion of job. Interest wili be charged a8er 30 days from the billing date at a rate of 1-1/2% per month, <br />wh'tch is an annual rate of 18%. This proposal may be cancelied at any time prtor to midnight of the third business day after the date <br />of this uansaction. <br />? <br />
The URL can be used to link to this page
Your browser does not support the video tag.