Laserfiche WebLink
.,.?? <br />? <br />, 7.2 PROOF-OF-PERFORMANCE OVERSIGHT <br />Consultant proposes to witness and confirm proof-of-performance tests and test <br />? data on behalf of Client. Proof-of-performance tests shall be conducted in <br />accordance with the requirements of the Specifications. <br />? <br />7.3 ACCEPTANCE TEST OVERSIGHT <br />? Consultant offers to witness and supervise the acceptance tests required by the <br />Specifications. These tests are to be conducted independently of the proof-of- <br />? performance tests to verify that optimum equipment reliability has been achieved. <br />The acceptance tests shall be conducted in accordance with the Specifications. <br />' <br />7.4 OPERATING PERSONNEL TRAINING <br />? Consultant proposes to coordinate and supervise the operating-personnel training <br />program to be provided by the Contractor in accordance with the Specifications. <br />? <br />7.5 DOCUMENTATION OVERSIGHT <br />1 Consultant proposes to inspect, evaluate, and determine the acceptability of <br />equipment and system technical documentation to be supplied to Client by <br />, Contractor in accordance with the Specifications. <br />' 8.0 PROTECT START AND COMPLETION <br />Consultant shall be prepared to commence the proposed project within fifteen (15) <br />' working-days following receipt of formal written authorization from Client. <br />' Completion of Section 7.5 shall conclude all efforts proposed herein. <br />, <br />t CITY OF NORTH OLMSTED • PROPOSAL NtJMBER MP-950710.2 ? <br />PAGC 8 <br />, STEIGEF, HURRAY 8 ASSOCIATES WC. <br />HINCKLEY. OHIO 44233 <br />.?..W.c.x:.a%? .._. . . : ..? . ..... . ... . . . . . . ? . .. .. .. .... . . ?m„?.:«.:..? .,.,,,. ..,. t...?. ,:>:,ce????.z.^t?nso?r ._.? ., .. _:._? . . .... ? . .. ... ... .. . .