Laserfiche WebLink
SUMMERLAND AVENUE <br />Storm sewer plan <br />Storm sewer profile <br />Sewer design calculations <br />Quantities <br />Subtotal <br />C. WATER V40RK <br />Specifications <br />Details <br />Subtotal <br />$14.43 <br />(Avg. Rate) <br />20 $276 $386 $53 $715 <br />20 $276 $386 $53 $715 <br />16 $256 $358 $49 $663 <br />4 $64 $90 $12 $166 <br />140 $2,020 $2,826 $387 $5,233 <br />4 <br />16 <br />$14.90 20 <br />(Avg. Rate) <br />$64 $90 <br />$234 $328 <br />$298 $418 <br />$12 $166 <br />$45 $607 <br />$57 $773 <br />D. MISCELLANEOUS <br />Construction cost estimate 6 $104 $146 $20 $270 <br />Pre-bid meeting 2 $32 $45 $6 $83 <br />Bid evaluation 4 $64 $90 $12 $166 <br />Utility Coordination 4 $64 $90 $12 $166 <br />Meetings and reviews 8 $160 $224 $31 $415 <br />Subtotal $17.67 24 $424 $595 $81 $1,100 <br /> (Avg. Rate) <br />TOTAL ALL PARTS $14.87 532 $7,913 $11,078 $1,516 ;20,507 <br /> (Avg. Rate) <br />SUBCONSULTANT COSTS <br />Field Survey by Hofmann-Metzker, Inc. ?,000 <br />DIRECT COSTS $409 <br />GRAND TOTAL <br />$26,916