My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
95-032 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
1995
>
95-032 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2014 3:25:50 PM
Creation date
12/23/2013 11:19:31 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
95-032
Legislation Date
3/7/1995
Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- 9 - <br />the effectiveness of the entire sewer rehabilitation project to <br />the person listed in Paragraph 21, above, and to: <br />Enforcement Group Leader <br />Division of Surface Waste <br />Northeast District Office <br />Ohio EPA <br />2110 E. Aurora Rd. <br />Twinsburg, OH 44087 <br />The certification shall be signed by an authorized representative <br />of the City and notarized. For each Phase after Phase F of the <br />Sanitary Main, Sanitary and Storm connection Rehabilitation <br />project that North Olmsted chooses to undertake and implement <br />during the term of this Decree, North Olmsted shall inform EPA <br />and OEPA of the start and completion dates of such Phase and <br />shall certify completion of and submit an analysis about the <br />Phase, as described in this paragraph. <br />24. By July 1, 1995, North Olmsted shall make the following <br />equipment changes at the Plant and have such equipment fully <br />operational: <br />a) Replace current diffusion system with a tapered, fine <br />bubble diffusion system; <br />b) Connect two final clarifiers of the Storage Facility to <br />the aeration process and ensure that the existing or <br />improved aeration capacity is sufficient to handle the <br />increased flows from the two clarifiers. <br />c) Add an additional aeration blower; <br />d) Add programmable blower controllers; <br />e) Add influent DO probes for all four aeration tanks; and
The URL can be used to link to this page
Your browser does not support the video tag.