Laserfiche WebLink
- 9 - <br />the effectiveness of the entire sewer rehabilitation project to <br />the person listed in Paragraph 21, above, and to: <br />Enforcement Group Leader <br />Division of Surface Waste <br />Northeast District Office <br />Ohio EPA <br />2110 E. Aurora Rd. <br />Twinsburg, OH 44087 <br />The certification shall be signed by an authorized representative <br />of the City and notarized. For each Phase after Phase F of the <br />Sanitary Main, Sanitary and Storm connection Rehabilitation <br />project that North Olmsted chooses to undertake and implement <br />during the term of this Decree, North Olmsted shall inform EPA <br />and OEPA of the start and completion dates of such Phase and <br />shall certify completion of and submit an analysis about the <br />Phase, as described in this paragraph. <br />24. By July 1, 1995, North Olmsted shall make the following <br />equipment changes at the Plant and have such equipment fully <br />operational: <br />a) Replace current diffusion system with a tapered, fine <br />bubble diffusion system; <br />b) Connect two final clarifiers of the Storage Facility to <br />the aeration process and ensure that the existing or <br />improved aeration capacity is sufficient to handle the <br />increased flows from the two clarifiers. <br />c) Add an additional aeration blower; <br />d) Add programmable blower controllers; <br />e) Add influent DO probes for all four aeration tanks; and