My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
95-018 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1995
>
95-018 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2014 3:25:56 PM
Creation date
12/26/2013 4:03:05 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
95-018
Legislation Date
3/7/1995
Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 3 <br />City of North Olmsted <br />Attn: Mr. Ralph Bohlmann, <br />Service Director <br />C. Construction Services <br />November 30, 1994 <br />This project will be administered by the City of North Olmsted. The W.R.E.S. <br />Corporation will be available to provide consultation services during construction to interpret <br />plan intent and answer any pertinent questions. <br />U. TIlVIE SCHEDULE <br />Construction plans will be completed within sucteen (16) weeks of authorization to <br />proceed. <br />M. FEE SCHFDUL? <br />We propose a fee for the above basic services of Seventeen T'housand Five Hundred <br />Dollars ($17,500.00). <br />IV. SUPPLEIVIENTARY SERVICFS AND CHARGFS <br />Not included in the fee for basic services are various supplementary services. These <br />supplementary services vary greatly in scope, complexity and timing. They may be a prominent <br />part of some engineering projects and not exist with others. Such supplementary services when <br />performed by the Engineer shall be paid at our prevailing per diem rates. When performed by <br />others, the charge will be at 1.1 times the actual cost to cover overhead. <br />l. Calculation of special assessments. <br />2. Procuring pernuts, easements or rights-of-way. <br />3. Additional services resulting from significant changes in the general scope of <br />design of the project. <br />4. Preparing for public hearing or attendance. <br />5. Specialized traffic studies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.