Laserfiche WebLink
? ?6 1997 <br />(b) <br />(3) Two year renewal( if paid by <br />7anuary 31of year due ) 100.00 120.00 140.00 <br />(4) After August 31, prior to <br />November 20 50.00 55.00 65.00 <br />(5) After November 20 (certificate sha11 be <br /> issued for following year) 90.00 100.00 120.00 <br />plumb ' and sewer Work. This base fee for any <br />plumbing or sewer pernut on new construction and/or <br />additions, alterations shall be: <br /> 15.00 15.00 15.00 <br />to which sha11 be added the following charges <br />for each unit installed or altered. <br />(1) All lavatories 2.50 2.75 3.25 <br />(2) Kitchen sink 2.50 2.75 3.25 <br />(3) Bar sink 2.50 2.75 3.25 <br />(4) Laundry trays 2.50 2.75 3.25 <br />(5) Toilets 2.50 2.75 3.25 <br />(6) Tub 2.50 2.75 3.25 <br />(7) Tub with shower 2.50 2.75 3.25 <br />(8) Shower stall 2.50 2.75 3.25 <br />(9) Shower-gang (four feet or fraction <br /> of shower) 2.50 2.75 3.25 <br />(10) Water softener or filter 2.50 2.75 3.25 <br />(11) Urina1(pedestal, lip or wa11 hung) 2.50 2.75 3.25 <br />(12) Urinal (four feet or fraction <br /> of trough) 2.50 2.75 3.25 <br />(13) Garbage grinder 2.50 2.75 3.25 <br />(14) Dishwasher 2.50 2.75 3.25 <br />(15) Drain; refrigerator, floor, area, yard, <br /> each 2.50 2.75 3.25 <br />(16) Drinking fountain 2.50 2.75 3.25 <br />(17) Sterilizer 2.50 2.75 3.25 <br />(18) Dental chair 2..50 2.75 3.25 <br />(19) Sump pump or ejector 2,50 2.75 3.25 <br />(20) Domestic or range boiler 150 4.25 4.75 <br />(21) Water heater or storage tank (up to <br /> 150 gallons) 3,50 4.25 4.75 <br />(22) Water heater or storage tank (150 to <br /> 500 gallons) 4,75 5.50 6.25 <br />(23) Water heater or storage tank (over 500 <br /> gallons) 6.00 6.75 8.00 <br />?,..,.,??? ?a.n?.,u_.??,????.?? ??.w??.??•??? ?,a.? ? ,,. ? .. ...