Laserfiche WebLink
? <br />? <br />b. Conduct final inspection in the company of ENGINEER, <br />OWNER and CONTRACTOR and prepare a final list of items <br />to be corrected. <br />c. Verify that all items on final list have been <br />corrected and make recor.unendations to ENGINEER concerning <br />acceptance. <br />C. LIMITATIONS OF AUTHORITY. <br />Except upon written instructions of ENGINEER, Resident Project <br />Representative: <br />1. Shall not authorize any deviation from the Contract <br />Documents or approve any substitute materials or equip- <br />ment. <br />2. Shall not undertake any of the responsibilities of <br />CONTRACTOR, subcontractors or CONTRACTOR'S superin- <br />tendent. <br />3. Shall not expedite Work for the CONTRACTOR. <br />4. Shall not advise on or issue directions relative to any <br />aspect of the means, methods, techniques, sequences or <br />procedures of construction unless such is specifically <br />called for in the Contract Documents. <br />5. Shall not advise on or issue directions as to safety <br />precautions and programs in connection with the Work. <br />6. Shall not authorize OWIJER to occupy the Project in whole <br />or in part. <br />7. Shall not participate in specialized field or laboratory <br />tests. <br />ADAPTED FROM NSPE PUBLICATION NO. 1910-1-A, 1970 EDITION <br />?,?Llc?a?eze` tooOen?a $G c!?g?a?, nc.. Wc <br />--- Ta d ?